Engineering & Construction Management Department. May Report, 2011. EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W.
E N D
Engineering & Construction Management Department MayReport, 2011 EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W • General Project Description: The project will consist of the extension of Runway 8R-26L 1,100 feet to the east as well as the extension of Taxiway L to the east by approximately 1,100 feet, new runway and taxiway lighting for the extensions and a new hold pad for Runway 26L. Construction Activities: • P-209 Base Material placement on Taxiway L and W • Conduit for taxiway edge lights installed • Handholes for conduit being installed • 25% complete • Asphalt placement scheduled for May 3, 2011 • P-501 Concrete scheduled May 31, 2011 Project Schedule Page 1 of 2
Engineering & Construction Management Department MayReport, 2011 EPIA Runway 8R-26L & Taxiway L Extension & Reconstruction of Taxiway W • General Project Description: The project will consist of the extension of Runway 8R-26L 1,100 feet to the east as well as the extension of Taxiway L to the east by approximately 1,100 feet, new runway and taxiway lighting for the extensions and a new hold pad for Runway 26L. Project Budget: (includes approved project development, design and construction costs) $7,563,087.00 Notes Funding Source: FAA Grant and PFC Project Contact Project Manager Construction Manager Victoria Ruiz Jerry Phares City of El Paso Paragon Project Resources Inc. 915-541-4357915-771-0121 Design Consultant Mike Norby Kimley-Horn & Associates Construction Contractor J.A.R. Construction Page 2 of 2