1 / 33

Budgeting and fund raising

Budgeting and fund raising. Based on EHES Manual, Part A. Planning and preparation of the survey, 2 nd edition (2016) Available at: http://urn.fi/URN:ISBN:978-952-302-700-8 These slides can be used freely, translated and adapted to national use (e.g. concerning national sources of funding).

tjody
Download Presentation

Budgeting and fund raising

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Budgeting and fund raising

  2. Based on EHES Manual, Part A. Planning and preparation of the survey, 2nd edition (2016) • Available at: http://urn.fi/URN:ISBN:978-952-302-700-8 • These slides can be used freely, translated and adapted to national use (e.g. concerning national sources of funding).

  3. Purpose of the survey budget • Gives an estimate of the amount of money needed to carry out the planned survey • Can be used in discussions with the collaborators/stakeholders • Cost of additional modules • Cost of increased sample size

  4. Components of the survey budget • Planning and preparing • Coordination • Sampling • Training of personnel • Dissemination (PR-activities) • Piloting • Recruitment of participants • Fieldwork of the full-size HES • Laboratory analysis and sample storage • Data entry and cleaning • Quality assurance • Analysis and reporting

  5. Cost categories • Personnel costs • Salaries and per diems • Insurances • Equipment and material costs • Other costs • Travel • Renting • Etc.

  6. Planning and preparing • Personnel • Project leader • Survey coordinator • Senior researchers and experts, incl. experts on specific measurements, laboratory experts and experts of legal and ethical issues • ICT expert • Survey statistician • Press officer

  7. Coordination • Personnel • Project leader • Survey coordinator • Fieldwork supervisor • Other costs • Coordination office • Travel costs • Recruitment of fieldwork staff • Equipment and materials • Computers with internet connection, printers, software licences, scanners • Office supplies

  8. Sampling • Personnel • Statistician • Data manager • Equipment and materials • Computers • Software licenses • Other costs • Sample drawing / obtaining the sampling frame(s)

  9. Training of personnel • Personnel • Trainers for each measurement included in the survey • ICT support/expert • Press officer • Statistician • Legal and ethical expert • Trainees i.e. fieldwork staff • Equipment and materials • Measurement devices • Computers • Other costs • Premises for the training • Travel costs

  10. Dissemination • Personnel • Press officer • Possibly also graphical designer • Other costs • Printing of the promotion materials • Press conferences • TV and radio/social mediaadds • Design of the website • Travel costs

  11. Piloting • Personnel • Full fieldwork teams • ICT support • Laboratory personnel • Data manager • Statistician • Equipment and materials • Measurement devices • Computers • Other costs • Printing and mailing invitations, questionnaires etc. • Travel costs • Transfer of materials • Rent of the examination site • Evaluation • Re-training • Updating of computer programs, if needed

  12. Recruitment of participants • Personnel • Assistant to prepare and mail invitation letters and/or to make the phone calls • Contact person to provide more information about the survey • Data manager or assistant • Equipment and materials • Computers • Software licenses • Other costs • Toll-free phone number

  13. Fieldwork • Personnel • Full fieldwork teams • ICT support • Data manager • Medical doctor for consultations, if needed • Equipment and materials • Measurement devices • Other costs • Travel costs • Transport of materials • Rents of the examination sites • Storage of the materials on the field • Data transfer • Phone and internet connections

  14. Laboratory analysisand sample storage • Personnel • Laboratory personnel • Data manager • Medical doctor for consultation, if needed • Equipment and materials • Material for sample handling in the laboratory • Reagents • Deep freezers (-70oC) • Other costs • Security system for the deep freezers

  15. Data entry and cleaning • Personnel • Data manager • Data entry personnel if data is keyed in from the paper forms • Statistician • Equipment and materials • Computers • Software licenses

  16. Quality assurance • Personnel • Senior researcher/ • epidemiologist • Data manager • Statistician • Laboratory personnel • Equipment and materials • Measurement specific devices • Computers • Software licenses • Other costs • Travel costs

  17. Analysis and reporting • Personnel • Data manager • Statistician • Researchers • Equipment and materials • Computers • Software licenses • Other costs • Graphical design of the reports • Printing of the reports

  18. Funds vs. survey contents Included: • measurements • questionnaire modules Sample size Available funds

  19. Adding a new module • Additional examination or questionnaire module increases budget by • Equipment / questionnaire preparation costs • Personnel cost and examination site rents through increased examination time per participant • Training and piloting costs • Data management and handling costs • Quality control costs • Data analysis and reporting costs

  20. Example budget: assumptions • Sample size 4000 persons • Examination takes 45 minutes • Fieldwork team works 7 hours per day • Can examine 3 participants per hour • Scheduling 20 participants per day • Staying 5 days (one week) in one location per team • Total of 100 participants per location • Total of 40 locations

  21. Example budget: assumptions • Mailed or web-questionnaire self-administered at home before the examination • Returned (checked)at the examination • Flow of the examination • Nurse 1: Reception, checking of the questionnaire and obtaining informed consent • Nurse 2: Blood pressure measurement and anthropometric measurements • Laboratory technician: Blood sample drawing and handling

  22. Example budget: assumptions • Planning and preparation takes 12 months, required personnel (total: 68,000.00€) • ICT expert: 2 fte (full-time-equivalent=fte) • Statistician: 2 fte • Researchers/advisers: 4.5 fte • Laboratory experts: 1 fte • PR person: 0.6 fte • 2 fieldwork teams working simultaneously • Composition of the fieldwork team (salary 3,000€/person) • 2 Nurses • 1 Laboratory technician

  23. Example budget – total costs • Total budget 800.000€ • Personnel costs 63% • Equipment costs 7% • Other costs 30% • Travels and material transfer costs • Cost per invited person 200 €

  24. Example budget – costs

  25. Cost of adding one examination module • Assumptions • Can be performed by same nurses as the core measurements • Training of the nurses to perform the added measurement correctly takes one day • Added measurement takes about 5 minutes per participant

  26. Cost of adding one examination module • Additional costs for planning: • Preparation and documentation of the protocol (at least one week full time job for researcher) • Preparation and coding of the data item definitions (together with following, at least one week full time job for data manager) • Preparation of • the measurement recording form (paper or electronic) • the feedback to the participants Total addition for preparation costs 3100 €

  27. Cost of adding one examination module • Additional costs for training: • Equipment for two teams • One extra day salaries of the fieldwork team members • One extra day salaries of the trainer • One extra day of the room rent for training place Total addition for training costs about 7000 €

  28. Cost of adding a examination module • Additional costs for piloting: • 200 participants, 5 minutes additional per participant, total of additional days (1.5 days per team) • Salaries of • Fieldwork team • ICT support • Data manager • Coordination team Total addition for pilot costs about 7400 €

  29. Cost of adding one examination module • Additional costs for fieldwork: • 4000 persons, 5 minutes additional time each, total of 48 additional examination days (24 days per team) • Salaries of • the fieldwork team • ICT support • Data manager • Coordination team • Rents of examination sites Total addition for fieldwork cost about 53 000 €

  30. Sources of funding in previous national HESs • Common sources of funding: • Ministries, mainly Ministry of Health and Ministry of Research • National Public Health Institutes • Social and other insurance institutes/organizations • Research foundations/institutes/organizations • Associations/Foundations

  31. Excel programme for budgeting Available at http://www.ehes.info/rc/tools/time_cost.xls

  32. Acknowledgements • Slides and the Excel program for budgeting: Hanna Tolonen • Experiences and feedback from the EHES network have been utilized in the preparation of these slides • Funding: Preparation of the slides is part of the activities of the EHES Coordinating Centre which has received funding from the EC/DG SANTÉ in 2009-2012 through SANCO/2008/C2/02-SI2.538318 EHES and Grand Agreement number 2009-23-01, and in 2015-2017 through Grand Agreement number 664691/BRIDGE Health

  33. Disclaimer • The views expressed here are those of the authors and they do not represent the Commission’s official position.

More Related