An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. [[Click on topic to view page]]

  2. BACK to main page > environmental and Physical considerations > accommodations and security on-site > construction space and storage of materials on the site > special requirements based on the design plans and site environment > documentations and specifications e.g. building permit > plan drawings of Foundation system, Structural system, external envelope e.g. portal frame design - a clients engages an architect and consulting engineer who prepare structural design drawings of the portal frame and submit the project to the tender - the builder sub-contracts the structural steelwork to steel fabricator on the basis of the consulting engineer drawing - steel fabrication is started by following the detail shop drawings drawn by draftsmen > site set out, excavation, foundations, structural frame set up, external envelope system, internal finish next >>

  3. BACK to main page Pre-fabrication considerations of off-site production > logistic - storage - transport - site - management > procurement - contract form - management - manufacture > motivation - costs - skills - project management > site assembly - site environment - labour - management > Design - rationalisation - standardisation - co-ordination - decisions next >>

  4. BACK to main page Pre-fabricated metal ideal for roofing and walling STEEL Advantages - no waster material - capacity for long clear span - quick construction times Disadvantage - some reduction in thermal insulation - low thermal mass ( high temperature variation) - sound transmission may be problem is not detailed well next >>

  5. [[Click on topic to view page]]

  6. BACK to main page [[Click on image to start video]] next >>

  7. BACK to main page Pre construction process architect engineer builder tender off-site fabrication fabricator Shop drawings Under construction process on-site construction steelworker Concrete panel labour Finish building next >>

  8. BACK to main page Preparation of Pad Footing Floating the bolts (Fig. C003) > hole excavated ready for concrete foundation > holding down bolts are then inserted and fixed to a timber base plate, which is same size as the steel base plate and holes are in the same position. > timber base plate fixed to a temporary timber frame > temporary timber frame fixed to correct level by pegged into the surrounding ground and held at the correct position > concrete can be poured around the bolts after level checked (Fig.C003) next >>

  9. BACK to main page Section Drawings of Pad Footing drawn by architect and engineer next >>

  10. [[Click on topic to view page]]

  11. Steel Portal Frame > economic alternative to warehouse structure > To be effective a pitched roof portal frame should have as low a pitch as practical to minimize spread at the knee joint. > the connection to the column haunched at the knee joint to make the connection deeper and stiffer > the haunching can be fabricated by welding a I-section to the rafter, which is the most economic in steel fabrication. - Design by architect - Liasion with structural engineer - Tender documents - Quotes from steel fabricator - Shop drawings—accurate details by draftsperson - Fabrication—off site - erection of steelwork BACK to main page next >>

  12. BACK to main page Base Plate of Steel Column > steel base plae welded or fixed with bolted connection with angle cleats Column attached to Pad Footing > Large washer fixed to bolt to prevent pull out > holding down bolts set into the concrete foundation > non shrinkable grout filled void left below steel base plate > steel packing shims fixed under base plate at correct level > Base plate welded to bottom of column next >>

  13. BACK to main page Stages of setting up stanchion next >>

  14. BACK to main page [[Click on topic to view page]]

  15. BACK to main page Apex Joint Stiffening at ridge of steel portal frame at apex joint > the junction of the rafter at the ridge is often stiffened by welding I-section haunching to the underside of the rafter> end plates welded to rafter and hauncing and bolted together << back next >>

  16. BACK to main page Knee Joint Haunch to the steel portal frame at knee joint > The haunched connection of the rafter to the column can be fabricated by welding a I-cut section haunching to the underside of the rafter> the haunch length is usually of the order of 10%-15% of the span of the rafter> with the depth of the section at the haunch is about twice of rafter depth > web stiffener welded to top of column bolt connection from column to haunching << back next >>

  17. BACK to main page • Cross Bracing • secure the structural elements from wind loads • avoid bending of the structural elements • - resist lateral forces bracing between stanchion to stanchion Roof bracing next >>

  18. [[Click on topic to view page]]

  19. BACK to main page Precast Concrete PanelAdvantage - good sound reduction - good fire resistance - loadbearing capacity - high thermal mass (less variation of temperture) Disadvantage - large amount of work required on-site - negerates waste on-site (drilling holes for services - units are heavy - high degree of finishing required on-site next >>

  20. BACK to main page Precast Concrete Panel- bolted to stanchion -Typical shop drawing of panel details required next >>

  21. BACK to main page Lifting up Concrete Panel Standard concrete panels and units are stored ready for delivery Panel can be assembled around a frame or can from self supporting structure Mobile crane may be required next >>

  22. BACK to main page Connection between stanchion and concrete panel

  23. BACK to main page Steel Sheet Cladding - Roof/wall sheeting: approx. 0.4mm thick- Made from zincalume (Zinc & aluminium coated steel)- Available in a variety of profiles, including traditional corrugated and concealed fixed products- Sheeting is usually ‘custom cut’ by the manufacturer to suit the requirements for a particular job- Spanning capabilities: roof: 1200mm – corrugated sheeting; 2700mm –stronger, deeper profiles walls: can be 25 – 50% greater than roof spans Advantages - Cost effective - Lightweight - High structural capacity - Low maintenance - Consistency of quality - Zincalume steel: high solar reflectance qualities; rapid heat dissipation Disadvantages - Limitation to heights that can be reached by sheeting next >>

  24. BACK to main page Steel Sheet Cladding next >>

  25. [[Click on topic to view page]]

  26. BACK to main page The construction of buildings. Volume 4, Foundations and sub-structures, steel frames, concrete, concrete frames, external walls of framed buildings, R. Barry , BSP Professional Books, 1992, c1986 Construction and Structures 2 Reading, Deakin university 2006 Roofing, Walling, Rainwater & Structural Products, Stramit Corporation Pty Ltd, may 2004 Barry Advanced Construction of Buildings, Stepen E & Christopher G, Blackwell, 2006 http://www.roger-bullivant.co.uk/web/products_services.htm, accessed 24.05.2006 [ RETURN home]