1 / 1

400

3000. 14000. PROJECT TITLE. 450. 충주시 문화회관 무대기계장치. 18. 19. 20. 21. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 2000. 3000. 400. 300. 600. 600. 500. 600. 700. 450. 450. 600. 600. 400. 700. 530. 400. 350. 420. 500. 800. 700.

tola
Download Presentation

400

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3000 14000 PROJECT TITLE 450 충주시 문화회관 무대기계장치 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2000 3000 400 300 600 600 500 600 700 450 450 600 600 400 700 530 400 350 420 500 800 700 HORIZONT CURTAIN 21 REAR SCREEN 20 UPPER HORIZONT LIGHT BATTEN 19 DEAW CURTAIN-신설 17 NO.5 PLY BATTEN-이설 18 NO.3 SUSPENSION LIGHT BATTEN 15 7200 NO.2 UPPER SOUND REFLECTION BOARD 14 NO.3 SET BATTEN 13 NO.2 SUSPENSION LIGHT BATTEN 12 NO.2 BORDER LIGHT BATTEN 11 DRAW CURTAIN 10 NO.2 SET BATTEN 08 SCREEN 08 NO.1 UPPER SOUND REFLECTION BOARD 07 NO.1 SET BATTEN 08 4000 NO.1 SUSPENSION LIGHT BATTEN 05 NO.1 BORDER LIGHT BATTEN 04 DRAW CURTAIN 03 PLACARD BATTEN 02 CONTOUR CURTAIN 01 SIDE SOUND REFLECTION BOARD 24 SIDE SOUND REFLECTION BOARD 22 4000 7700 4000 21 22 23 24 900 STAGE PLAN

More Related