DCLL R&D Evaluations Summary

Summary of R&D evaluations and tasks for TBM planning and costing meeting. Assess R&D importance, schedule, costs, and risks.

tontiveros
Download Presentation

DCLL R&D Evaluations Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14, 2005 TBM Planning and Costing Meeting

  2. Main DCLL R&D areas TBM Planning and Costing Meeting

  3. Evaluating R&D Tasks • Summarize the main purpose of this subtask. What critical need does this R&D address? Is it more oriented towards (1) Establishing basic TBM feasibility for fusion (2) Understanding/predicting TBM performance required for design, or (3) Adding to safety and qualification database. • Summarize the risks to the machine or mission if this R&D is not performed. • Do you have suggestions for modification of this R&D Subtask to make it more useful or cost effective? For instance, you know of specific facilities, past work, capabilities that already exist that could be tapped for this work? Etc. • Categorize this subtask based on the following system: • E = Essential for the qualification and successful execution of the TBM experiment, and no other party is doing it • I = Important for the qualification and successful execution of the TBM experiment, or Essential but is definitely being done by another party • D = Desirable but the risk is acceptable if not performed • Categorize this subtask schedule over the next 10 year period based on the following system • B = Beginning 3-4 years. Needed immediately for preliminary design choices • M = Middle 3-4 years. Needed in the middle of the next 10 years after initial R&D is performed (for instance for qualification or integrated effects tests). • E = Ending 3-4 years. Needed before performance of first experiments or is specific for subsequent modules TBM Planning and Costing Meeting

  4. 10 year R&D Cost Estimate Summary (burdened, 2005 dollars, no contingency) TBM Planning and Costing Meeting

  5. DCLL 1st Test Module Fabrication Schedule Summary *Prototype may or may not be full scale TBM Planning and Costing Meeting

  6. Main DCLL TBM R&D areas Yellow indicates some disagreement TBM Planning and Costing Meeting

  7. Resolving remaining conflicts • Let me speak to coordinator and people offering dissenting opinions and make a judgment for the first draft of the report • People can make a case offering a different opinion and we will note it in the report as well • Other suggestions? Committee, etc… TBM Planning and Costing Meeting

  8. What needs to be provided/written by task coordinators by Dec 23 • Review the WBS structure (Attachment 1) and provide any suggested changes before proceeding with the following actions. Create lower level WBS elements to the point where costs will be collected (subtask level either 6 or 7). • Prepare a brief description of the work scope content for each WBS element for which you are responsible utilizing the format provided in Attachment 2. These descriptions should clearly reflect what is included or excluded from the associated estimate and the basis for the scope and requirements. TBM Planning and Costing Meeting

  9. What needs to be written (cont.) • Fill in the detailed cost sheet (Attachment 3), one for eachWBS subtask level 6 and 7. For the current pre CD-0 cost activity, it is not necessary to have every element on the form completed, but where the detail is available, please provide it. Contingency is not included in the base cost. • Complete Attachment 4 by summarizing the detailed cost sheets completed in action 3. • Using Tables 2 and 3, fill in the assessment of the technical, cost, and schedule risks and the weighting factors on the bottom section of the detailed cost sheets generated in step 4 (Attachment 3) (one for each WBS level 6 and 7). TBM Planning and Costing Meeting

  10. What needs to be written (cont.) • Using the format in Attachment 4, provide a schedule network (list of activities and durations) for all of your Level 6 and 7 WBS elements, with at least 3 activities listed for each WBS element. When designating predecessors or successor activities, please be sure to consider activities that must be done by other participants and the Planning Milestones (see attachment 5). List key assumptions. • Review the milestones provided in Attachment 5; suggest others to show start or finish of significant project tasks. Provide the expected completion dates. • For each WBS level 5 (or below) list and describe the major risks utilizing Attachment 6 and the guidelines in Tables 4 – 6. TBM Planning and Costing Meeting