Design Elements • Detailed design requirements • Engineering Specification Document (ESD) • Documents to support fabrication & installation. • Detailed drawings and models. • Assembly procedures, component travelers, fabrication QA. • Documents for long term operation & maintenance. • System Schematics • Project Data Base • Design data and operational histories.
LCLS Installation and Commissioning Time-Line X-Ray tunnel/FEH Install X-Rays in FEH LTU/Und/Dump FEE/NEH Install First Spont. Light CF Early Occupancy X-Ray Systems Checkout - Commission e- beam & Photon Systems Checkout CD-4b CD-4a S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2007 2008 2009 2010 PPS PPS Photon Flux Measurements Controls checkout Re-commission Inj/BC2 to SL2 Operations LTU/Und/FEE Commissioning NEH Operations Linac/BC2 Commissioning linac/BC2 Install FEL Commissioning
BC2/L3/BSY Status2007 Installation • BC2 Status • Designs are almost complete! • Spot Shielding – drawings ready waiting RP final approval. • Seismic proofing of center movable magnets is working. • L3 Status • Designs are complete! • All beam line components/supports are in fabrication. Sufficient documentation for installation SOW. • BSY Status • Corrector & Quad Modification – with Accelerator Dept.
BTH StatusLTU Co-occupancy 2008 • 6/11 Section ID drawings released. • Component Stands out for fabrication. • Support Drawings for SOW / Stand Installation complete. • Magnet Drawings Complete • BYKIK Assembly • Drift Tubes / Prototype & Standard Lengths complete. • Working • Repackaged diagnostics where necessary. • Spot Shielding / Collimation
Electron DumpsCo-occupancy 2008 • 2/3 ESD pending RP analysis. • 80% of design for fabrication complete. • Working • Main Electron Dump • Electron Safety Dump • ST1,2,3 (3 XES Stoppers d.s.Safety Dump) • TDUND (Tune-Up Dump between LTU & UND) • PCPM1 / Shielding (Collimator at Dump Vertex) • Wall 1 Interface (Shield Wall d.s. of electrons)
Design / Data Base Sector 21 Simplified Models / Project Data Base Laser stopper BLM BC1 LX L1 Ins/SAB Wall
6-Months Look-ahead • Complete Design2 for LTU & E-Dumps. • Prepare Models for Operations. • Secure all non-model information into DB. • Support all Undulator & LUSI requests. • Prepare to get small!