DESIGN OPTION OF THE FLOOD MITIGATION PLAN OF SG. MUDA, SUNGAI MUDA, KEDAH Final Draft REPORT. (September 28, 2006). Scope of Work. (a) Rainfall data in space and time leading to chosen flood events. (b) Runoff discharge and stage records of the chosen events;
E N D
DESIGN OPTION OF THE FLOOD MITIGATION PLANOF SG. MUDA, SUNGAI MUDA, KEDAHFinal Draft REPORT (September 28, 2006)
Scope of Work (a) Rainfall data in space and time leading to chosen flood events. (b) Runoff discharge and stage records of the chosen events; (c) Computer simulation of the flood events; (d) Computer simulation of long term river behaviour to determine stretches prone to meandering, hence needing extra protection; (e) Changes in alluvial river geometry in terms of aggradation and degradation as well as lateral channel migration as a result of the flood events; (f) Design criteria used for the Flood Control Remediation Plan; (g) Specific design of the proposed structures including levee protection, riverbank protection works and protection of bridge crossings and other structures.
Contents • Muda River Flood 2003 • Hydrological Modeling • Hydraulic Modeling • Sediment Sampling • River Modeling • Mitigation and Protection Works • Conclusions and Recommendations
October 1998 Flood Flood Prone Areas (Oct 1998 Flood)
Flood Ranking Sg. Muda @ Syed Omar Sg. Muda @ Ladang Victoria
Hydrological Modeling Design Flood Hydrograph of 5, 20, 50 and 100 yr ARI for Sg Muda at Ladang Victoria (JICA, 1995) Design Flood Hydrograph of 5, 20, 50 and 100 yr ARI for Sg Muda at Ladang Victoria (Zaaba, 2002)
DISCHARGE STATION: Jambatan Syed Omar (5606410) Ladang Victoria (5505412) RAINFALL STATION: Bt. 27 Jln. Baling (5507076) Bt. 61 Jln. Baling (5808001) Jeniang Klinik (5806066) Komplek Rumah Muda (6108001) MODEL SET UP CALIBRATION –OCTOBER 2003 VALIDATION – NOVEMBER 1998 HEC-HMS
Simulated Flood Profiles for Alternative 2 under 50-year and 100-year ARI with Proposed Bund Levels along Sg. Muda
Longitudinal Flood Profile for Sg Muda (Q=1340m3/s) Bridge Railway Bridge Pipe Bridge Expressway Bridge Merdeka Bridge Muda Barrage
Flood Levels under 1 in 50 yr and 100 yr ARIs, with Proposed Bund Levels for Sg Muda
Bed Material Sampling Jbt Pinang Tunggal Pantai Perai (Sand Mining3) d50=2.50 mm Sand Mining 1 (d/s Pinang Tunggal) d50=1.30 mm d50=2.50 mm Sand Mining 4 (Batu Tera) Sand Mining 2 (u/s Pinang Tunggal) d50=1.20 mm Jbt Ldg Victoria
Bed Material Sampling Muara 2 d50=0.11 mm Jbt Kota Kuala Muda d50=0.10 mm Muara 4 Muara 1 Muara 3