1 / 15

A comprehensive synergy initiative for the: European Mobility on Renewable Energy

A comprehensive synergy initiative for the: European Mobility on Renewable Energy. Fomenting Energy & Technology. enabled through the Energy Vector Hydrogen and the Via Azul ENERGY QUADRANTS : Energy Resources, Energy Transmission, Energy Storage and Energy Application.

toril
Download Presentation

A comprehensive synergy initiative for the: European Mobility on Renewable Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A comprehensive synergy initiative for the:European Mobility on Renewable Energy Fomenting Energy & Technology enabled through the Energy Vector Hydrogen and the Via Azul ENERGY QUADRANTS: Energy Resources, Energy Transmission, Energy Storage and Energy Application Current Via Azul initiators:

  2. MOVE RENEWABLE ENERGY • Alongthe 10 initialhighways TO THE POINT OF SALE • Renewableenergysources

  3. Establish the Critical Massfor the EU Electro Mobility..! • Smart Grid enabled RE Supply/Demand balancing • Renewable (low-carbon) Energies (RLCE) Energy Transmission EnergyResources • Regional RLCE plants • Super Grid Transportation European Mobility on Renewable Energy • Fuelling stations/ Vehicle fleets • Local storage infrastructure EnergyApplication Energy Storage • Energy efficient driving and easy rapid fueling (Battery + FC) • H2Electrolysers/Metal HydridesNew gener. batteries/charging

  4. Vía Azul ENERGY QUADRANTS

  5. VíaAzulENERGY QUADRANTS • 1. Renewable (low-carbon) Energy Resources like : • EU-North Wind-Off-Shore farms • EU-South Solar Power plants • Water Etc. 2. TheElectrical Energy Transmission to the Point-of-Sale (PoS), applying HVDC underground cable technology, can substantially shorten line approval cycles for a new Wide Area Network of the Via Azul Energy Supply Grid. The WAN, implemented on the 10 VA highwayswith complementary (HV)AC Local Area Networks,enables charging/fuelling every 50 km. Via Azul Energy Supply Grid • 3. Required infrastructure at PoS fuelling station, providing Energy Storage via: • => Direct grid connected vehicle batteries • => Local facilities for hydrogengeneration, storage and flexible disposal • These enable, together with the supporting Smart Grid technology, accurate net stability and supply/demand balance for renewable (low-carbon) energy sources. • 4. Electro and hydrogen based low-carbon mobilityapplications like hybrid, battery & fuel cell vehicles, starting in VA pilotregions and cities.

  6. Via Azul Energy Supply Grid (Example) WAN* * HVDChighway cable LAN/H2 Grid

  7. Network of existing/amplified Highway Fuelling Stations Electrolyser Cascading H2 Backup Storage Operative CGH Storage< 1.000 bar Smart Grid 2nd H2 Flow FC Vehicle Fuelling CGH Flow 1stH2 Flow 3rdH2 Flow E Vehicle Charging H2 Compression Fuel Cell Stack Battery Switching RapidPlug-In WAN LAN E Vehicle Charging Options

  8. VíaAzulvalue add European Mobility on Renewable Energy

  9. Via Azul Roadmap to accomplish -50% CO2iea BLUE MAP scenario 2050 Local extension networks European rollout on 10 initial VA highways Proof of concept in 4 VA Pilot Regions Highway Smart Grid: Renewable power plants to Point-of-Sales Stakeholder VA Consortium Feasibility Study time ♦ ♦ ♦ ♦ ♦ ♦ 2022 2020 2015 2013 2011 2030 11 years Via Azul Europe 10 to accomplish -50% CO2iea BLUE MAP by 2050 //

  10. Estimated key figures(based on the final implemented capacity of 662 initial fuelling stations)

  11. Feasibility studywork program – process flow To elaborate on feasibilities 6. Merge results & roadmap + Stake-holder network 2. E-Resources 7. Imple-mentation plan + R&D framework Refine objectives & challenges 3. E-Transmission 4. E-Storage 5. E-Application regulatory technical economic environmental ♦ ♦ ♦ ♦ ♦ ♦ ♦ 0. Project Management The corresponding flyer can be downloaded: http://www.via-azul.eu/links/links.htm

  12. Feasibility Study: Stakeholder networking (negotiation status) for Public Private Partnership • Industry partners • Energy Resources • SET-Plan EIIs ‘Solar’ and ‘Wind’ • Energy Transmission • SET-Plan EII ‘Grids’ • Energy Storage • SET Plan EII ‘FCH JU’ • Energy Application • SET Plan EII ‘FCH JU’ • European Hydrogen Bus Alliance • Other local electro vehicle initiatives • Public authorities (EU and national/local Ministries) • EU • Cabinet EC Oettinger • SET Plan • AT • CH • DE • ES • IT • Others

  13. Via Azul to enforcea SET-Plan EII* ‘Electro Mobility’..? Up to 50% savings on investments through synergy potentials, if the European Mobility on Renewable Energy (EM-RE)would be driven by EII Electro Mobility (!EII EM) EM-RE EII EM: To synergize! EII SolarEII Wind EII Grid!EII EM • Current SET-Plan EIIs: • Bioenergy • CO2 • Electricity Grid • Fuel Cells and Hydrogen • Nuclear • Smart Cities • Solar • Wind • Electro Mobility (EM) ObjectiveAreas EII FCH JU!EII EM EII FCH JU!EII EM EnergyResourcesEIIs Solar/Wind EnergyTransmission EII Grid EnergyStorage EII FCH JU EnergyApplication EII FCH JU Currently: EU wide spread and various efforts on EM-RE Key Components, to realize diverse national Mobility Strategies *European Industry Initiative

  14. Tampere Stockholm Oslo Glasgow Belfast Amsterdam Lyon Milano Freiburg Hamburg Memmingen Paris Bratislava Istanbul Marseille Madrid Lisboa Malaga Palermo JOINED AND SYNCHRONIZED Green Corridor‘NWDE-Benelux‘: DE-BG-NL REGIONAL DEVELOPMENTS • 10 initial highways… • WithPilot Regions Green Corridor‘Rhone-Alps’: FR-CH-DE Green Corridor‘Verona-Brenner-Munich’: IT-AT-DE Gdansk Cardiff Krakow • In collaborationwith: Graz Green Corridor‘Pyrenees oriental’: ES-FR Green Corridor‘Andalucía-Madrid’:ES Athen

  15. We are preparing a VA meeting in the Bolzano region’s office in Brussels by the end of November, to share Green Corridor Brenner experiences with other interested VA Pilot Regions..! • Pilot Regions will be:First time movers and • eMobility beneficiaries..! • How could your region contribute… with current, planned or new VA projects… as well as funding, resources and political support..? Interested and motivated contributors welcome! (info@via-azul.eu)

More Related