1 / 26

Time from HQ = 1.0 minutes

On- and Off-road Emergency Response (within 1.0 minutes). Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…. Time from HQ = 1.0 minutes. “ splash ”. HQ start. HQ start. Hiking. ATV. Truck. Estimated response time in minutes. (Berry).

traciw
Download Presentation

Time from HQ = 1.0 minutes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. On- and Off-road Emergency Response(within 1.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 1.0 minutes “splash” HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  2. On- and Off-road Emergency Response(within 2.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 2.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  3. On- and Off-road Emergency Response(within 3.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 3.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  4. On- and Off-road Emergency Response(within 4.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 4.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  5. On- and Off-road Emergency Response(within 5.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 6.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  6. On- and Off-road Emergency Response(within 8.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 8.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  7. On- and Off-road Emergency Response(within 10.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 10.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  8. On- and Off-road Emergency Response(within 15.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 15.0 minutes HQ start HQ start Roaring River is an absolute barrier to movement… …bridge is only place to cross Hiking ATV Truck Estimated response time in minutes (Berry)

  9. On- and Off-road Emergency Response(within 20.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 20.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  10. On- and Off-road Emergency Response(within 25.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 25.0 minutes HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  11. On- and Off-road Emergency Response(within 30.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 30.0 minutes …only ATV and hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  12. On- and Off-road Emergency Response(within 35.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 35.0 minutes …only ATV and hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  13. On- and Off-road Emergency Response(within 40.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 40.0 minutes …only ATV and hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  14. On- and Off-road Emergency Response(within 45.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 45.0 minutes …only ATV and hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  15. On- and Off-road Emergency Response(within 50.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 50.0 minutes …only ATV and hiking HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  16. On- and Off-road Emergency Response(within 55.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 55.0 minutes …only ATV and hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  17. On- and Off-road Emergency Response(within 60.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 60.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  18. On- and Off-road Emergency Response(within 65.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 65.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  19. On- and Off-road Emergency Response(within 70.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 70.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  20. On- and Off-road Emergency Response(within 75.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 75.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  21. On- and Off-road Emergency Response(within 80.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 80.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  22. On- and Off-road Emergency Response(within 85.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 85.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  23. On- and Off-road Emergency Response(within 90.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 90.0 minutes …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  24. On- and Off-road Emergency Response(within 96.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… Time from HQ = 96.0 minutes Farthest away location (96.0 minutes) …only hiking HQ start HQ start Hiking ATV Truck Estimated response time in minutes (Berry)

  25. On- and Off-road Emergency Response(within 95.0 minutes) 2D Planimetric Map Minimum travel-time considering on- and off-road travel by truck, ATV and hiking… …farthest away location is at the bottom of a steep canyon with very poor accessibility 2D Planimetric Map Fact Abstraction Farthest away location (96.0 minutes) Farthest away location (96.0 minutes) Elevation Surface Travel-time Surface Conceptual3D Space — minutes Real3D Space — feet Hiking ATV Truck Estimated response time in minutes (Berry)

  26. On- and Off-road Emergency Response(Least Cost Path) …like a raindrop, the “Steepest Downhill Path” identifies the optimal route (Quickest Path) as it traces the shortest but not-necessarily-straight route the accumulated travel-time wavefront took in reaching the end location. Road = 19 min ATV = 15 min Hiking = 62min Optimal Path superimposed on 2D Road Map 96min HQ Optimal Path draped over 3D Travel-time Surface This procedure, termedLeast Cost Path analysis, is a generalized map-ematical technique that can be applied to most routing applications. For example, in routing a proposed electric transmission line, 1) engineering, environmental, legal, land use, political and other information are translated into absolute and relative costs (suitability of conditions), then 2) an accumulated cost surface is generated, and finally 3) the optimal path identified. Identifying all of the nearly optimal paths (Nth optimal paths) generates a Least Cost Corridor of best locations for identifying and assessing alternative routes. (Berry)

More Related