1 / 8

Synchronization Process PSB example

Synchronization Process PSB example. Synchronization using a Modulo 360 o phase discriminator with adiabatic frequency changes. Synchronization Process. Only small frequency steps are tolerated D f small when closing the loop or small loop gain

tracykelly
Download Presentation

Synchronization Process PSB example

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Synchronization ProcessPSB example Synchronization using a Modulo 360o phase discriminator with adiabatic frequency changes A. Blas AB/RF/FB

  2. Synchronization Process • Only small frequency steps are tolerated • Df small when closing the loop • or small loop gain • Avoid the non-linear region of the Phase discriminator when closing the phase synchronization loop • Wait until DF crosses a value far enough from the non-linear point • High loop gain Solution chosen in the PSB: • Impose Df before closing the synchro phase loop • Wait until DF zero crossing to close the loop A. Blas AB/RF/FB

  3. Synchronization in the PSB Start Freq. Beating Start Flat-Top Start Phase Synchro. A. Blas AB/RF/FB

  4. Weaknesses of the PSB synchronization process. • It starts only at the extraction top field when the rf frequency is close enough to the reference value. • It lasts long to be adiabatic A. Blas AB/RF/FB

  5. What signals are available in the LEIR type digital beam control ? Real-time frequency and phase (with respect to the cavity rf) are available for the beam and the reference A. Blas AB/RF/FB

  6. Synchronization with the LEIR type beam control (#1) With this method, the system undergoes a transient at the loop closure A. Blas AB/RF/FB

  7. Synchronization with the LEIR type beam control (#2) No phase transient ! A. Blas AB/RF/FB

  8. Synchronization with the LEIR type beam control (#3) End Setup Start Setup Synchronization can be started any time without transient nor radial steering A. Blas AB/RF/FB

More Related