60 likes | 170 Views
HP-II Workshop on Real-time Hydrological Information Systems. INTRODUCTION. Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrological Information Systems Innovative Hydrology, Inc. Consultant to the World Bank.
E N D
HP-II Workshop on Real-time Hydrological Information Systems INTRODUCTION Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrological Information Systems Innovative Hydrology, Inc. Consultant to the World Bank
Examples that refer to products are intended for illustrative purposes only, and do not imply an endorsement or recommendation of any particular product
Workshop Goal and Objectives • GOAL: Develop Expertise with the Technical Aspects of Acquiring and Managing a Hydrological Information System • Objectives • Understand the Design of a Hydrological Information System • Familiarization with Instrumentation, Data Transmission and Data Management Solutions common in an advancedHIS • Review Keys to Specifying your Hydrological Information System • Understand the pre-bid and Bid Evaluation Phase • Equipment Delivery and Acceptance • What is involved in Commissioning your Hydrological Information System • How to Manage your HIS during the Warranty Period • How to Manage and Maintain your HIS after Warranty Period
HIS Implementation Process • Design • Tender • Tender Preparation • Pre-bid meetings • Bid Evaluation • Bid Award • Equipment Delivery • Equipment Inspection • Commissioning • Warranty • Operation, Maintenance and Training