1 / 6

Is Your Security Over Fixtures Fiction?

Is Your Security Over Fixtures Fiction?. Jeffrey M. Katz Partner, Dechert LLP. Fixtures and Lien Priorities. What are Fixtures? UCC § 9-102(41): “[G]oods that have become so related to particular real property that an interest in them arises under real property law.”

trevor
Download Presentation

Is Your Security Over Fixtures Fiction?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Is Your Security Over Fixtures Fiction? Jeffrey M. Katz Partner, Dechert LLP

  2. Fixtures and Lien Priorities • What are Fixtures? • UCC § 9-102(41): “[G]oods that have become so related to particular real property that an interest in them arises under real property law.” • Why is it important to know if a Good has become a Fixture? General Rule • UCC § 9-334(c): Subject to limited exceptions, “a security interest in fixtures is subordinate to a conflicting interest of an encumbrancer or owner of the related real property other than the debtor.” • Under the general rule, a security interest in fixtures previously perfected by a UCC-1 financing statement properly filed with the appropriate Secretary of State’s office will lose to a later-filed mortgage on or other recorded interest in the real property. • What about “First-in-Time, First-in-Right”? What the Fixtures Lienor Must do to Prevail • 2 Major Exceptions to General Rule • Prior Fixture Filing • Purchase-Money Security Interest

  3. Fixtures and Lien Priorities (cont’d) UCC-1 Filing • Secretary of State’s Office Fixture Filing • Local real property records; office where mortgage would be recorded • Prior Fixture Filing – UCC § 9-334(e) • If the fixture filing is recorded in the real property records before the competing real property interest, the fixtures lienor will prevail (first-in-time, first-in-right) • Purchase Money Security Interests – UCC § 9-334(d) • The secured obligation represents “the price of the [fixtures] or…value given to enable the debtor to acquire [the fixtures]…UCC § 9-103(a)(2) AND • The security interest in the fixtures is perfected by a “fixture filing” before the goods become fixtures or within 20 days thereafter. UCC § 9-334(d)(3) ● So, in the case of a PMSI on the fixtures, even if the conflicting real property interest arose and was recorded prior to the creation of the security interest in the fixtures, the fixtures lienor prevails.

  4. “So Related to Particular Real Property” • Is it a Fixture? • Some variation in state-by-state analysis, but following factors common: • Has it been attached in a permanent manner? • Is it adaptable to the property’s intended use? • Will its removal damage the property? • Intent of the parties • Some relevant precedent: • In re Williams, 381 B.R. 742 (2008) (home guttering system held not to be a fixture under UCC Article 9; court found that, since gutters wear out and require replacement and their removal would not extensively damage the property, they are not fixtures) • Brown v. Blake, 161 S.W.3d 298 (2004)

  5. Solar Panels • Solar Panels as Fixtures? • A question of growing relevance; current application of fixtures issue • Will depend upon how they are attached to roof, extent of damage caused on removal, and contractual characterization, if any • certainly “adopted to use of realty” if it will supply power • Some related precedent • Energy Control Services v. Arizona, 658 P.2d 820 (1982) (solar water heater held to be a fixture under similar test under unrelated statute) • In re Arlett, 22 B.R. 732 (1982)(solar water heater held to be a fixture under UCC Article 9; was attached to roof by bolts and plumbing and deemed permanent)

  6. Priority vs. Construction Mortgagee • UCC § 9-334(h) – unless the PMSI fixture filer filed before recordation of the construction mortgage,a construction mortgagee defeats the PMSI fixture filer, so long as the fixtures are attached prior to the completion of construction. • Usual rule protecting PMSI fixture filers does not apply here. If FF made here, FF liens win (§9-334(e)) If FF made here, construction mortgagee wins (§9-334(h)) Construction loan recorded Panels attached to house Completion of construction • A solar panel manufacturer supplying into a construction project should ensure that its fixture filing is made prior to filing of construction mortgage (or make appropriate contractual intercreditor arrangements), or else it won’t have the senior lien in its supplied solar panels.