An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Financial Achievability Of Anaerobic Digestion Projects Lisa Lee Morgan, AIA, LEED-AP President + CEO Calor Energy

  2. The AD Process – “Basic” • Feedstocks • Digestion • Outputs o oooooo o oooooo o oooooo CO2 Gas o oooooo CH4 o oooooo o oooooo Liquids Digestate Solids - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  3. Key Revenues + Costs • Feedstocks • Digestion • Outputs o oooooo o oooooo o oooooo CO2 Gas o oooooo CH4 o oooooo o oooooo Liquids Digestate Solids $ Land $ $ Technology $ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - $ Disposal $ $ Offtake $ - - - - - - - - - - - - - - - - - - - -

  4. First Cut Rule of Thumb Revenue of $ / Ton of Waste Revenue of $ / Megawatt-hr Revenue of $ / Ton Fertilizer $140

  5. Feedstock $$$

  6. Community Viability Charlotte San Francisco

  7. Feedstocks BTU Spectrum • WW Waste • Ag Waste • Food Waste • Animal Waste Processed, digested, excreted Raw, unprocessed, undigested LOW BTU Content HIGH

  8. Feedstocks Disposal Fees

  9. Feedstocks Project Models PURISTS : Harvest Power – Investor-owned AD Facilities • Designed to maximize gas quality and financial yield • Pre-consumer food waste only • No contaminants, paper, body wastes • Formula: 2/3 hi-cal food waste + 1/3 green waste • Vancouver: $65/Ton + $150/MWh + $20/Ton = $235 MIXED BAGGERS : Columbia Biogas – Community-owned AD Facilities • Designed to maximize community participation • Pre- and Post-consumer food waste • Formula: 1/3 food + 1/3 FOG, beer, milk + 1/3 green, grocery • Expensive pre- and post-treatment • Portland: $55/WTon + $70/MWh + $20/Fton = $145

  10. Digestion Process - “Basic” Feedstock In Mixing Rods Gas Storage Heated Pulp Biogas Pretreat to Pulp Fluids Solids Heat Exchanger Digestate Digestion Reactor

  11. Digestion $$$

  12. Model Example Tax Equity Investor 50% Cash 100% Tax Incentives 90% / 5% Owner Bal Sheet = Insurance Developer 5% Owner Project Manager Team Lead Municipal WWTF 5% / 95% Owner Electricity user Operations Utility: MWh Heat: MMbtu Fertilizer: Ton Waste: Fees Lender 50% Cash 15 yr @ 5% secured EPC Engineering/Procurement/Contractor “NC Digester Group, LLC”

  13. Production Example

  14. Tax Incentives

  15. Output $$$

  16. Outputs 101 Biogas -> Electricity/CHP Gas Fueled Biogas Storage Electric Generator Power Grid 750-1000 Gas Clean Up Digester BTU/FT3 Boiler Gas Fueled Industrial SteamUsers

  17. Outputs 201 Biogas -> Transportation Fuels Natural Gas Pipeline Biogas Storage Bottled Compressed NG (RNG) 900-1000 Gas Clean Up Digester BTU/FT3 Compressor CNG Vehicles

  18. Outputs 301 Digestate -> Fertilizers Liquids Nutrient-Rich Liquid Fertilizer Compost Rows Solid Digestate Storage Digester Dewater - - - - - - - - - - Highly Enriched Organic Fertilizer - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

  19. Annual Cash Flow

  20. Investor/Lender Expectations

  21. Community Analysis Rule of $140 ? Maximize what ? Feedstocks? Technology ? Outputs ?

  22. Questions?