Western Area Power AdministrationOpen Access Transmission Tariff Ron Moulton Western Area Power Administration September 14, 2004
Agenda • OATT Revision Effort • Revisions to Accommodate LGI • Other Revisions • OASIS • wesTTrans.net • Transmission Business Unit • Contact Information
Western OATT Revision Effort • Goals • Prepare Revised OATT for Filing, Spring 2005. • Comply with Western’s Core Mission • Obtain FERC Approval • Support by Customers • Coordinate with Western’s General Requirements for Interconnection
Large Generator Interconnection • Analyzed Pro Forma LGI IA/IP • Minimized Pro Forma variations • Areas of Modification Recommended • Protect Statutory Obligations • Maintain Non-Jurisdictional Status • Account for Federal Laws • Payment of Interest • Do Not Pay Taxes
Large Generator Interconnection • Elimination of Liquidated Damages Provisions • Use of Reasonable or “Best” Efforts • Payment of Actual Costs • Advance Payment for Network Upgrades • Network Upgrade Crediting Policy • 40 Year Term Limit • NEPA Compliance
Other Revisions • Application Fee & Deposit • Network Operating Agreements & Committees • Advance Payment for Ancillary Services • Creditworthiness • Contingent Upon Appropriations • Transmission Peak Calculation Methodology
Other Revisions • Clarification of Attachment K Coverage for Transmission Used to Deliver BCP Electric Service • Eliminate “Change of Rates” Language from Attachment J • Accommodate Longer-Term Non-Firm Service • Energy Imbalance Schedule Modified • Roll-Over Language in Service Agreement • Several “editorial” Updates
Schedule • Spring, 2004 • Assemble OATT Revision Team • Summer, 2004 • Develop Proposed OATT Revisions • Autumn 2004 • Customer Comments • Winter 2005 • Final OATT/FERC Filing • Spring 2005 • OATT Effective
OASIS • wesTTrans Common OASIS • PPIW/WestConnect+ Joint Effort • Powered by OATI • Single Transmission Market Interface for the Western Interconnection. • 19 Transmission Providers • http://www.westtrans.net
Transmission Business Unit • DSWR OATT Management • Requests for OATT Transmission Service • Firm Point-to-Point • Non-Firm Point-to-Point • Network Integration • Requests for OATT Interconnection Service • Large Generator • Small Generator • Transmission Line • Ancillary Services
Transmission Business Unit • TBU Contacts • John Delgado • (602) 352-2660 • delgado@wapa.gov • Paul Dux • (602) 252-2784 • pdux@wapa.gov • Nancy Whitson • (602) 352-2667 • nwhitson@wapa.gov
Contact Information • For more information, please contact: • Ron Moulton • (602) 352-2668 • moulton@wapa.gov • Tony Montoya • (602) 352-2780 • tmontoya@wapa.gov