10 likes | 122 Views
NER300.com. “Relevant cost” and “ranking cost”. “Relevant cost” is a term used in the NER300 legislation to determine the sum that NER300 can refund, up to 50% “Ranking cost” is not a term used in NER300, but means the basis for calculating cost as it is defined for the ranking of proposals.
E N D
NER300.com “Relevant cost” and “ranking cost” “Relevant cost” is a term used in the NER300 legislation to determine the sum that NER300 can refund, up to 50% “Ranking cost” is not a term used in NER300, but means the basis for calculating cost as it is defined for the ranking of proposals. Developer contribution Investment aid from MS (from 0 to any %age of relevant costs allowable by State Aid) NER300 grant (from 0 to 50% of relevant costs) OPEX 5 yrs CAPEX Operating Benefit 5 yrs Value of market support schemes 5 yrs REF RELEVANT COSTS DEMO RANKING COSTS