1 / 12

„The first steps” – Hungarian Participation in FP6

„The first steps” – Hungarian Participation in FP6. Roland Gurály Research Director Slot Consulting Ltd. www.slotconsulting.hu. Overview on Participation. Hungary and with other New Member States joined FP5 – limited number of participation in projects

troy-meyer
Download Presentation

„The first steps” – Hungarian Participation in FP6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. „The first steps”– Hungarian Participation in FP6 Roland Gurály Research Director Slot Consulting Ltd. www.slotconsulting.hu

  2. Overview on Participation • Hungary and with other New Member States joined FP5 – limited number of participation in projects • FP6 (6th Framework Programme of the European Commission): full member from the beginning but not an EU member till the middle of the Programme (1st of May 2004) „The first steps” - Hungarian particiaption in FP6

  3. Participation in Aeronautics • The Aeronautical work programme of FP6 did not take into consideration the differences of the New Member States (NMS, EU-10) from the „Old” Member States (EU-15) • The aeronautical industry of NMSs was not „FP6 compliant”: • No small aircraft development • No UAVs • Limited effort on regional aircraft development • Limited and delayed efforts to try to enhance participation of those organisations from NMS who could contribute to the „mainstream” of the Workprogramme „The first steps” - Hungarian particiaption in FP6

  4. Participation in Aeronautics 2 • The „non-compliance” resulted in a Net Payer Status of the NMS (incl. Hungary) of the FP6 budget in aeronautics. • Hungarian organisations could not benefit from being part of an international knowledge transfer through research projects. • HOWEWER: THERE IS A PROGRESS!!! „The first steps” - Hungarian particiaption in FP6

  5. Projects with Hungarian Participation • THENA – Slot Consulting • CAATS - Slot Consulting • OPTAG – Slot Consulting • SCRATCH IV - Slot Consulting • SCRATCH V - Slot Consulting • SINDBAD – BUTE • SUPERSKYSENSE – LUFTHANSA T. „The first steps” - Hungarian particiaption in FP6

  6. THENA • THENA – FP5 – DG TREN: THEmatic Network on Airports • Collecting and distributing all research results related to airports: - efficiency, capacity - safety, security - environment „The first steps” - Hungarian particiaption in FP6

  7. CAATS • CAATS – FP6 - DG TREN Cooperative Action on Air Traffic Services • Cooperating with other research projects in the following fields of Air Traffic Management: - safety - human factors - validation „The first steps” - Hungarian particiaption in FP6

  8. OPTAG • OPTAG („Optical Tag”) – FP6 - DG Research • Improving airport Efficiency, Security and Passenger Flow by Enhanced Passenger Monitoring • A „typical” research project aiming to develop a new system • Main objective is to improve efficiency and security at airports „The first steps” - Hungarian particiaption in FP6

  9. OPTAG 2 Combining: • Closed Circuit Television (CCTV) system and • Radio Frequency Identification (RFID) tags • Main benefit: A missing passenger can be found and passenger related delays can be significantly decreased „The first steps” - Hungarian particiaption in FP6

  10. OPTAG 3 „The first steps” - Hungarian particiaption in FP6

  11. OPTAG 4 Tasks of Slot Consulting: • Exploitation: how the system fits into an airport environment (operational scenarios, efficiency and security analysis) • Dissemination of information: presentations, website – www.optag-consortium.com - User Club • Economic Verification • Trial organisation „The first steps” - Hungarian particiaption in FP6

  12. Towards FP7 • Progress has started in FP6 but more should be done in FP7: - EC should help NMS to „catch up” with the European aeronautical R&D industry - NMS should harmonise their research goals to FP7 - Large industry should be more open to take organisations from NMS „on board” „The first steps” - Hungarian particiaption in FP6

More Related