An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tales in Embedded Sensing Derek Skolnik, Martin Lukac V. Naik, W. Kaiser, P. Davis, J. Wallace, D. Estrin

  2. STORIES 50 - 70 40 - 50 20 - 40 • Tall Building Boom • Performance-based “alternative” designs require peer review per UBC 97 • Update LA-DBS instrumentationrequirements

  3. Saw cuts I-35W Bridge Collapse N • Structural Health Monitoring • Rapid post-event assessment • minimize downtime • Damage Detection • need more than acceleration

  4. SHMnet System • Model-driven deployments Sensors • Suite • Interstory displacement ENSBox • Time synchronization • Robust WLAN Algorithms • Damage detection • Post-event assessment

  5. Sensor Development • Two approaches used to measure interstory displacements • double integration of acceleration • LVDT with spring tensioned wire • New non-contact sensor LVDT Laser Plano-convex lens Accelerometer Photodiode

  6. SHMnet Systems

  7. SHMnet GeoNet standing up • System shared with GeoNet • Difference: deployment scenarios and sensors • Rapidly deployed after earthquakes • 0.5 – 1.0 Km grid • Active >= month

  8. Frequency of aftershocks determined by size of initial shock (Omori’s Law) Small EQ -> aftershocks for a few weeks Large EQ -> aftershocks for a few years Opportunity to study earthquake propagation near epicenter GeoNet: Aftershock Chaser . . .

  9. MASE & Peru vs GeoNet • Short term – smaller batteries • Integrated low power ADC • Passive seismometer • LEAP2 platform • Sleep scheduling • Long term • Big batteries • Solar panels • Power hungry ADC • Active seismometer 30+ days 5 days

  10. Sleep Scheduling: Impact on the Entire System Data Transport / Routing • Preserve routes between sleep cycles • Aggressive route repair after wake up Time Synchronization • Maintain sync across sleep cycles • Most important when no GPS available System Management • Disruption Tolerant Shell (DTS) • Used in MASE network, applicable here Deployment • Determine network capacity as deploying • Bound on sleep scheduling

  11. Thank You Please visit our poster