Safe Machine Parameters in LHC …ENERGY…
Energy Implementation 2010 switch between A and B
Energy Implementation 2010 switch between A and B ≈ 0.5 Hz cross-check dipole currents must be equivalent to BLM energy reading (1%)
Intensity Implementation 2010 switch between A and B no cross-check SMP 3v0 – 2011 will implement complete redundancy Energy and Intensity will be from multiple sources
Outstanding Issues - SMP 2v0 HW 1. Remove an external ROM – HW SBF glitch - MPP 2010-25 http://lhc-mpwg.web.cern.ch/lhc-mpwg/MPP-Meetings/No25-19032010/MPP_190310_minutes.docx ready ready ready ready waiting FESA JAVA HW SEQUENCER 2. Force SBF False at the start of every normal ramp – / / / . Improve SBF safety - modification authorised Evian 2010 http://indico.cern.ch/contributionDisplay.py?contribId=6&sessionId=3&confId=76921 study in progress 3. The Setup Beam Flag - HW / FESA / JAVA The limit is too low for some studies
Outstanding Issues - SMP 2v0 HW 1. Remove an external ROM – HW SBF glitch - MPP 2010-25 http://lhc-mpwg.web.cern.ch/lhc-mpwg/MPP-Meetings/No25-19032010/MPP_190310_minutes.docx ready ready ready ready waiting FESA JAVA HW SEQUENCER 2. Force SBF False at the start of every normal ramp – / / / . Improve SBF safety - modification authorised Evian 2010 http://indico.cern.ch/contributionDisplay.py?contribId=6&sessionId=3&confId=76921 study in progress 3. The Setup Beam Flag - HW / FESA / JAVA The limit is too low for some studies ready ready ready FESA JAVA HW 4. Filter the Beam Presence Flag – HW / FESA / JAVA Extraction Denial of Service - MPP 2010-26 http://lhc-mpwg.web.cern.ch/lhc-mpwg/MPP-Meetings/No26-16042010/MPP_160410_minutes.docx It’s complicated 5. Improve the Beam Presence Flag Fast Beam Current Transformer is currently the limiting factor….
Beam Presence Flag Signal Path Thresholds Definition https://edms.cern.ch/document/883620/
Beam Presence Flag Signal Path From end of September 2010
Beam Presence Flag Signal Path From end of September 2010
Beam Presence Flag Signal Path From end of September 2010 + fibres to be pulled + new hardware from BI + testing and commissioning
For high intensity beams we need to… Upgrade the operational controller → Ben & SMP Team When: next technical stop? Add a sequencer task → OP When: MPP to decide Release a new GUI → Ivan & SMP Team When: next technical stop? • Improve Beam Presence Flag safety • fibres in UA47 → Bruno & Fibre team • New BPM hardware unit → BI • Testing and Commissioning → BI & SMP Team • When: Ready for end of September Make the SBF more flexible → MPP & MI When:? Complete redundancy SMP 3v0 → many When: January 2011