Domino HouseWeek 4 of 6 EGR 105 Project Fall 2002
Architect: 300-350 dom internal area 5 interior rooms Openings into interior room of 2-4 lyns No interior doors Due to addition of (plain) interior walls: Blankness increase to 60-70% is okay Minimum Blankness Dispersion Ratio is dropped to 65% I/E Ratio > 1.25 Final Design Requirements
Project Manager: Stronger, more expensive anchors are available (see next slide) Change in time estimating: 3 wex to position a single domino (up from 2) Requirements: Maximum cost of 10 zwigs per dom of interior space Maximum time to build of 2.65 times the number of dominoes (n) Final Design Requirements
Structural Engineer: See appendix on substructures/multiple anchors Stronger anchors available: Final Design Requirements
Thermal Engineer: Tighter average temperature requirement: 50oD < Taverage < 60oD Final Design Requirements