An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Danalyzer Daily Automated Calibration Sequence Failures Stuart Gibbons - Offtake Arrangements 20 August 2013

  2. Topics Background Issue Mitigation

  3. Background • FWACV methodology utilised to determine daily CVs • Calculated for individual relevant inputs to and outputs from a particular charging zone • Based on individual determinations of CV made by gas transporters using instruments and software approved by Ofgem • Letter of Approval (LOA) • Ofgem to gas transporter for CVDD and software • Letter of Direction (LOD) • Ofgem to gas transporter - Prescribes manner and location to determine CV

  4. Issue • LOA mandates daily calibration of CVDD • Since 2008 NGGD directed sites have experienced sporadic failure to initiate automatic calibration • Visibility of issue recently come to light • Issue lies with Ofgem approved software interface to CVDD controller • Approx 10% of calibrations not initiated

  5. Mitigation • (FWACV) methodology utilised since 1997 • Vast data set • Showing instrument stable and no evidence of drift • NGGD tasked GL Noble Denton to establish materiality • Summary • Study concludes no detrimental impact on determined CV • No impact on LDZ energy calculations or NTS shrinkage • Whilst issue needs resolving – no detriment to consumers

  6. Danalyzer Daily Automated Calibration Sequence Failures Thank You