Muon Campus AIP Review MC Infrastructure Upgrade GPP Update Russ Alber FESS Engineering January 23, 2013. Site Prep GPP History. Site Prep GPP (original) - $3.2M Relocate Kautz Road and gas line - $2.1M New loop/redundant Feeder 24 - $1.1M Current lab-wide infrastructure upgrades:
E N D
Muon Campus AIP ReviewMC Infrastructure Upgrade GPP UpdateRuss AlberFESS EngineeringJanuary 23, 2013
Site Prep GPP History Site Prep GPP (original) - $3.2M • Relocate Kautz Road and gas line - $2.1M • New loop/redundant Feeder 24 - $1.1M Current lab-wide infrastructure upgrades: GPP – Master Substation Bypass SLI - new Master Substation - upgraded ICW upgrade Close Well No.1
“Infrastructure” GPP Candidates • Infrastructure GPP (New) - $?? • Required to run Projects • A-0 Cooling Options: • OPTION 1 Pond Cooling – • Phase 1 - $0.5M (2014) – run g-2 (pumps and piping risk to project) • Phase 2 - $1.0M-$1.5M (2017) – Pump and vault upgrades • OPTION 2 ICW - $?? • OPTION 3 Cooling Towers - $?? • MI-52 Extension - $0.5M (2014) • Possible Project Risks • Parallel Feeder 24 - $1.0M (2016) • New CUB LCW heat exchanger and pumps - ? • Chilled water piping replacement - ? • PBarHVAC (electronic and building cooling) - ?