1 / 18

ATFM IMPLEMENATION IN INDIA – FUTURE PLANS

ATFM IMPLEMENATION IN INDIA – FUTURE PLANS. PRESENTED BY- AIRPORTS AUTHORITY OF INDIA. CONTENTS. 3. Medium Term Objectives. 2. Immediate Focus. Long Term Plans-Road Ahead. C-ATFM Concepts. 1. 4. Value Addition. 4. DEPARTURE FLOWS ( PER WEEK ).

tyler-hill
Download Presentation

ATFM IMPLEMENATION IN INDIA – FUTURE PLANS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATFM IMPLEMENATION IN INDIA– FUTURE PLANS PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

  2. CONTENTS 3 Medium Term Objectives 2 Immediate Focus Long Term Plans-Road Ahead C-ATFM Concepts 1 4 Value Addition 4 ATFM WORKSHOP - Delhi 2015

  3. DEPARTURE FLOWS ( PER WEEK ) ATFM WORKSHOP - Delhi 2015

  4. INTERNATIONAL OUTBOUND FLOW ( PER WEEK) RUSSIA 45 About 2800 Flights per week NEAR EAST 80 EUROPE 296 FAR EAST 45 NEAR 300 MID EAST 1345 SOUTH EAST 445 Approximately 70% of the International Traffic operates within FIVE Hour flight time from India ATFM WORKSHOP - Delhi 2015

  5. ATFM Performance Priorities ATFM ATFM WORKSHOP - Delhi 2015

  6. ATM ENVIRONMENT TODAY ATM Airports The Different Stakeholders may have different interests , while progressing towards the same objective. AOs Service to Passengers

  7. NETWORK CENTRIC ATFM • The ATFM System Needs to be : • Flexible • Collaborative • Provide Common Situational Awareness • Involve all the Stakeholders ATFM WORKSHOP - Delhi 2015

  8. C-ATFM OBJECTIVES • Strategic Planning • Harmonized Link between • ASM and ATC • Civil Military • Coordination • “ Gate-to-Gate” • network planning • CDM Procedures • Enabling platform for interaction • Integration of Airport CDM • Airspace Users Tactical Priorities • Collaborative Contingency • Management

  9. MAIN FOCUS AREAS FOR INDIAN ATFM FUA ASM HUMAN RESOURCE MANAGEMENT DETERMINE AND MEASURE OPERATIONAL PERFORMANCE ANS STRATEGIC PLAN CDM Philosophy Integrated Airports with ATM ATFM WORKSHOP - Delhi 2015 9

  10. ATFM AND FUA • Network Wide View Shared between Civil and Military • Focus areas of cooperation • Inclusion of future civil/military airspace requirements • Enhanced cooperation in crisis and contingency situations • ASM system support and data management • ASM Post Ops and Performance Monitoring • Both ASM and FUA will focus on : • Enhanced airspace utilisation by civil and military • Airspace Configurations • ASM solutions • Procedures • Enhanced cooperation at pre-tactical and tactical level • Getting closer together planning and operations • Integrating ASM/ATFCM • Flexible Route deployment in the Upper Airspace ATFM WORKSHOP - Delhi 2015

  11. ATFM AND CDM • CDM TO BE INTEGRAL PART OF ATM • Expanding CDM Philosophy to cover all areas of Strategic ATM • Understanding Business Objectives Of Partners • Enabling Maximum Benefits With Minimum Restrictions • Proactive Feedback For Resource Augmentation / Optimization ATFM WORKSHOP - Delhi 2015

  12. FUTURE CHALLENGES • SYSTEMS INTEGRATION- From “ INTEROPERABLE “ to “ INTEGRATED “ systems • Utilizing the advanced avionics capabilities – RTA • Robust Communication Network – Leading to SWIM • Standard Protocols – FIXM, AIXM , WIXM…. ATFM WORKSHOP - Delhi 2015

  13. ATFM – FUTURE PLANS • CROSS BORDER ATFM • BILATERAL / MULTILATERAL ATFM DATA EXCHANGE • MULTI-NODAL ATFM • LOOKING BEYOND SUB-REGIONAL/ REGIONAL ATFM • A GLOBAL ATFM NETWORK ? ATFM WORKSHOP - Delhi 2015

  14. IMMEDIATE FOCUS • Creating a NET CENTRIC PAN National Integrated ASM+ATM+ATFM Structure • Integrated Data Flow- “AIS+AIRPORTS+AIRLINES+ATM+Military+MET” • Enabled CDM Platform • IFPS • Creating ATFM Specialists • Determining METRICS ATFM WORKSHOP - Delhi 2015

  15. MEDIUM TERM FOCUS • National Performance Targets for ATM ( and ATFM ) • Integrating Airports into ATFM network • FUA and ATFM • Working towards Harmonization in data exchange methods • Towards developing better MET products for ATFM • Participating as a NODE in the Regional ATFM Network ATFM WORKSHOP - Delhi 2015

  16. LONG TERM GOALS • ATFM – an important component of B1-FICE ( SWIM G-G) • Work towards enabling exchange of FLIGHT INTENT • Enable DIGITAL AIS , B1-AMET • Developments in ASM to enable FLEX ROUTES • Collaborative Traffic ( Trajectory ) Management for ATFM and Contingency Management • Leading to TBO – requires a powerful and responsive ATFM system. ATFM WORKSHOP - Delhi 2015

  17. TIMELINES • Immediate Future – • Next Two-three Years • Primary Focus :Domestic • Airport and Airspace DCB • Intermediate – • Three To Five Years • Bilateral / Multilateral ATFM Agreements • Bringing Short Range International Flights Under ATFM • Medium – • Five To Seven Years • Towards Regional ATFM • Long Range – • Seven And Beyond- • Pan Regional ATFM ? • Global SWIM ? ATFM WORKSHOP - Delhi 2015

  18. THANK YOU Airports Authority of India

More Related