Group 1 – Week 7

Group 1 – Week 7. Full Layout. Our floor plan is finished with all components except control unit, forwarding, hazards Forwarding data lines are there Just missing the unit & logic No hazards yet Control signal lines are ready and chart is finished PLA chart needs to be made.

Download Presentation

Group 1 – Week 7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group 1 – Week 7

  2. Full Layout • Our floor plan is finished with all components except control unit, forwarding, hazards • Forwarding data lines are there • Just missing the unit & logic • No hazards yet • Control signal lines are ready and chart is finished • PLA chart needs to be made

  3. Pipelined Control Signals Chart

  4. Testing – Bugs Found • Small bugs with components found this week • Set logic was buggy, reworked that in the ALU • Our adders had one bit line labeled wrong, 4th bit ok on some tests but wrong on others • Control PLA outputs were backwards (0:11) from the control line inputs (11:0)

  5. Next Steps • Get control PLA finished • Run our first instructions • First, try with nops between instructions • Then consecutive instruction with no hazards • Hazard logic • Less than three weeks to go!