LBT672 ADAPTIVE SECONDARY UNITSCurrent status, acceptance test plan and specifications LBT AO Review Firenze - 1011 November, 2005 A. Riccardi, M.Xompero, D. Zanotti, L. Busoni INAF – Osservatorio Astrofisico di Arcetri D. Gallieni ADS International srl R. Biasi Microgate srl
PRESENTATION OUTLINE LBT AO Review Firenze - 1011 November, 2005 • MECHANICS • WHERE WE ARE • BACKPLATE COATING ISSUE • PALNNED STEPS • MECHANICS AT • ELECTRONICS • WHERE WE ARE • OPEN ISSUES • ELECTRONICS TESTING • P45 TESTS • FUNCTIONALITY AND OPTICAL TESTS • REQUIREMENTS • ELECTRO-MECHANICAL ACCEPTANCE • ARCETRI TEST TOWER (ATT) FACILITY • ADSEC OPTICAL LAYOUT AND ALIGNEMNT IN ATT • OPTICAL ACCEPTANCE (SHELL FIGURE QUALITY, FLATTENING STABILITY)
MECHANICS: WHERE WE ARE LBT AO Review Firenze - 1011 November, 2005
MECHANICS: WHERE WE ARE LBT AO Review Firenze - 1011 November, 2005
BACKPLATE COATING LBT AO Review Firenze - 1011 November, 2005 Silver layer by chemical coating adhesion Gold layer by galvanic deposition mechanical strength, age stability Galvanic bath problem repeated two times Thermal stability problem on ring #7
MECHANICAL ALIGNMENT LBT AO Review Firenze - 1011 November, 2005
INTEGRATION ROOM LBT AO Review Firenze - 1011 November, 2005
NEXT STEPS LBT AO Review Firenze - 1011 November, 2005 BP finishing (ongoing, TBC by this week)
NEXT STEPS LBT AO Review Firenze - 1011 November, 2005 Dummy Shell installation test (by Nov.05) - pre-test next week w. G. Engineering Shell installation and dummy magnets gluing (by Dec.05) Engineering Shell installation and dummy magnets gluing (by Dec.05) TS2 installation and magnets gluing (by Jan.06)
HAZARDS LBT AO Review Firenze - 1011 November, 2005 Shells handling Procedure and tools assessment w. Guido B. on-site assistance […] BP repair (local) Procedure assessment on BP(P1) - Dec.05Jan.06 2w allocated in schedule after TS2 is removed
MECHANNICAL SHOP PROOF TEST LBT AO Review Firenze - 1011 November, 2005 640a012, Is.A, 3.11.05 3 days allocated before crating and shipping Unit#1 to Microgate HP#2 (1st ready) will be installed into the solar tower at this time Test with HP#2 (TBC) 3w DELAY on AIT management schedule (8 Sept. 2005)
ELECTRONICS:WHERE WE ARE LBT AO Review Firenze - 1011 November, 2005
ELECTRONICS:WHERE WE ARE LBT AO Review Firenze - 1011 November, 2005
NEW POWER BACKPLANE LBT AO Review Firenze - 1011 November, 2005 Complete testing and calibration at Microgate Verification on P45 (W47) Complete integration of other units (components in house !)
DISTRIBUTION BOARDS LBT AO Review Firenze - 1011 November, 2005 Mechanical matching tested on dummy boards at ADS Distribution board type ‘A’ currently being integrated at Microgate After functional tests, repeat mechanical check at ADS Proceed with integration of other boards
ELECTRONICS TEST & CALIBRATION LBT AO Review Firenze - 1011 November, 2005 Pre-screening (before integration w. mechanics). E.g. capsens board/actuator Full functional test and calibration Calibration data storage System components can be replaced with no need to recalibrate the entire system Burn-in test: full power, high thermal load on single backplanes (half-crate). Moderate overload on fully integrated unit without thin shell
FUNCTIONAL TEST AT LOW TEMPERATURE LBT AO Review Firenze - 1011 November, 2005 Will be conducted on a cooled truck trailer, connected to a docking station (shipping company based at walking distance from Microgate – easy and safe transport of integrated unit) Temperature range: -20°C - +20°C Purpose: functional test (not performance). Includes verification of capacitive sensors calibration using ‘mechanical’ reference pad Verification with test thin shell mounted as an option
P45 NEXT STEPS LBT AO Review Firenze - 1011 November, 2005 Installation and verification of new power backplane Replace all boards and actuators with LBT672 spares (Capsens board V3.0, DSP board V3.2). Minimal differences w.r.t. currently installed electronics, but 1:1 test always useful! Tracing of P45 operation to verify system reliability Repeat thermal stability tests on new electronics New: system operation with two backplanes (2x BCU, real-time communication daisy chain, 2x reference signal generator)
THERMAL STABILITY LBT AO Review Firenze - 1011 November, 2005 Strong inconsistency between P45 and test-stand measurements. Test stand: ~10 ppm/°C – P45: up to 200 ppm/°C (???) To be understood!
ELECTRO MECHANICAL TESTS AT MICROGATE LBT AO Review Firenze - 1011 November, 2005 • Elevation angles: 90°, 70°, 45°, 20° • AO configuration (~70um gap) • Noise < 10nm rms • Modal settling time < 1.5ms (0.7 goal) • Tracking of turbulence (0.65asec seeing, 20m/s speed) < 50nm rms WF (goal 28nm) from capsens reading (diagnostic buffers) • Chopping config (~100um gap) • ±4asec (80um PtV) 5Hz 90% duty cycle (goal ±7asec, 140um PtV) • On-source tilt reproducibility 10mas rms (goal 3mas) Milestone: Adsec Unit Ready for Optical Tests
OPTICAL TESTS IN ARCETRI LBT AO Review Firenze - 1011 November, 2005
REQUIREMENTS FOR STARTING OPTICAL TESTS LBT AO Review Firenze - 1011 November, 2005 • Opto-mechanical accept. tests passed(Adsec ready for Optical test milestone) • W acceptance test passed(W sensor ready for System Test milest) • Stands and trolleys • Hexapod accepted • Hexapod TCS software working • Absolute and relative positioning • Rotation around a point • Arcetri Test Tower facility working. 0.1°C stability= l/10 focus error, per 15min (goal 1hour) • Adsec procedure mounting on ATT tested w dummy • Retro-reflecting optics and holder tested (l/10 PtV) • Shell silver spraying successfully tested on dummy shells
ATT SCHEDULE LBT AO Review Firenze - 1011 November, 2005
911mm Winch 1064.7mm F1 F/1.22 13713mm F2 F/15.0 Lab ARCETRI TEST TOWER FACILITY LBT AO Review Firenze - 1011 November, 2005
3cm 2cm Parabola+flat Only mirrors RETRO-REFLECTOR AND HOLDER LBT AO Review Firenze - 1011 November, 2005 Telescope-likecarbon fiber structure
Alignment procedure LBT AO Review Firenze - 1011 November, 2005 1. Hex to move the spot on F1 2. Hex to move the spot on F2 keeping the spot on F1 3. Interf. Stage to set the focus 4. Hex+Interf. Stage to compensate spherical ab. Reference Optics mechanical pre-alignment: +/-3mm x-y (WFS +/-0.1 pix) +/-5mm z (WFS z+ stage clearance) +/-2deg (F/1.1 instead of F/1.2) Interferom.: F/14 Mirror: F/15 BS WFS
THERMAL FUNCTIONALITY TESTS LBT AO Review Firenze - 1011 November, 2005 • In Arcetri Test Tower • Temperature: 20°C, 10°C, 0°C, -5°C (goal -10°C) • Pressure 700hPa (mountain pressure) • Same electro-mechanical tests with same specifications • We are considering the possibility to move this test in MG: • no need of optical feedback • Cooled container down to -20°C • Conceptually part of electro-mechanical test • But… extra cost (rent of container)
MIRROR FLATTENING LBT AO Review Firenze - 1011 November, 2005 • Low order flattening using electrical signals (gap uniformity, refplate figure) • Identification of capsens areas on interferometer frame (fiducials, min 6) • Delta-commands = -WF/2 on capsens • Iterate until no improvement or f>0.2N • Local (given gap) calibration of capsens signals • 3-5Hz sinusoidal Tip&tilt: 4D-interferometer (30fps) and capsens reading. FFT (demodulation) for calibration constants • Iterate flattening after local calibration until no improvement or f>0.2
MIRROR FLATTENING SPECIFICATIONS LBT AO Review Firenze - 1011 November, 2005 • T=ambient, ambient+10°C, ambient-10°C • Flattening residual: • Min: < 65nm rms WF, peak force < 0.2N • Goal: < 30 nm rms WF, peak force < 0.07N • Chopping flattening: • 200nm rms (1/3 rms 0.2asec seeing,L0=20m) • 100nm rms (Goal) Milestone: Flattened secondary, ready for AO test
FLATTENING UNKNOWNS LBT AO Review Firenze - 1011 November, 2005 • Environmental disturbances (vibrations) • Shape of shell after de-blocking • Control effectiveness of chipped actuators (non-linearities)
THE END LBT AO Review Firenze - 1011 November, 2005