An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy CC Poland PlusProjects Review Meeting 11-12 April 2011 Project overview “ EGOR-CO2” „Integration of CO2 Sequestration with EGOR-CO2 technology (Enhanced Gas and Oil Recovery method).” Speaker: Stanisław NAGY Clean Coal Technologies

  2. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project summary

  3. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project summary

  4. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Contents Organisation of the project with workpackages. Deliverables/products. Timetable Budget Market analysis Open issues

  5. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Organisation of work packages WP0: Preparation of market analysis and assessment of businessopportunities.(PGNiG, LOTOS, AGH) budget: 11 k€ WP1: Data collection and construction of the static model of the Zalecze &Zuchlow gas field at basin and reservoir scale. (PGNiG, AGH); budget: 105 k€ WP2: Flow simulation and elements of geomechanics. Integrity analysis of the existing wells. (AGH, PGNiG), budget: 245 k€ WP3: Analysis of the possibilities to devise an inland transport of the CO2 to the potential injection zone, injection site infrastructure optimization and the assessment of the productivity. (PGNiG, AGH) budget: 85 k€ 5

  6. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Organisation of work packages WP4: Construction of geological & numerical model of B3 oil field with history match (AGH), budget: 115 k€ WP5: Analysis of possibilities to increase the recovery factor with the CO2-EOR method (AGH, LOTOS, EDF), budget: 181,4 k€ WP6: CO2 Injection monitoring design (AGH, Lotos), cost: 79 k€ WP7: Feasibility study (LOTOS, AGH), budget: 57 k€ WP8: Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity (Univ. Stavanger, AGH), budget: 760 k€

  7. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Interdependences between packages MARKET ANALYSIS WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8

  8. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description- expectations • improvement of oil recovery efficiency: recovery of significant amount of oil which arises in a reservoir after finishing the primary & secondary exploitation; • minimizing risk of geologic sequestration • answering the technical questions necessary for EOR method introduction in the industry: features of the technology is an increase of mobility and change of viscosity • Diagnosis of the EOR and EGR processes and their consequences • confirmation of logistical solutions of CO2 transportation

  9. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description – necessary workplan

  10. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.1 (AGH, PGNiG) Data collection and construction of the static model of the Zalecze & Zuchlow gas field at basin and reservoir scale T1.1Data collection and verification of the data quality T1.2Construction of the static model at basin and reservoir scale WORKPACKAGE No.2 (AGH, PGNiG) Flow simulation and elements of geomechanics. Integrity analysis of the existing wells T2.1Flow simulation and elements of geomechanics T2.2Integrity analysis of all existing wells

  11. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.3 (PGNiG, AGH) Analysis of the possibilities to devise an inland transport of the CO2 to the potential injection zone, injection site infrastructure optimization and the assessment of the productivity T3.1Elaboration of the most convenient and effective ways of transportation of the CO2 T3.2Injection infrastructure optimization T3.3 Influence of the miscibility zone appearance on productivity

  12. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.4 (AGH) WORKPACKAGE No.5 (AGH, LOTOS, EDF) Analysis of possibilities to increase the recovery factor with the CO2-EOR method Construction of geological & numerical model of B3 oil field with history match T5.1 Analysis of technical state of underground and surface infrastructure T5.2. Lab analysis with emphasis to sealing of structure after filling it with CO2 (chemical reaction/ long term laboratory work/simulation) T4.1Data collection and analysis T4.2Geomechanical analysis of reservoir and caprock strata T4.3Construction of numerical model of B3 field

  13. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.5 (AGH, LOTOS, EDF) WORKPACKAGE No.6 (AGH, LOTOS) Analysis of possibilities to increase the recovery factor with the CO2-EOR method New CO2 Injection monitoring design T6.1Project of passive seismic monitoring T6.2Optic parameters permanent downhole measuring system T 6.3 Water surface monitoring system T5.3Infill drilling opportunities - analysis and new drilling projects T5.4Short & long Impact of CO2 injection on Sea and Air Environment

  14. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.7 (AGH, LOTOS) WORKPACKAGE No.8 (Univ. Stavanger, AGH) Feasibility study Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity T 7.1Standard monitoring of process T 7.2Analysis of transport opportunity from Lotos Refinary Plant T 7.3Multivariant final economic analysis T8.1Methods of tight gas production at the Gro field A)Use of CO2 injection for the purpose of the fracturing process of the tight gas field T8.2Carbon dioxide injection as a tool to increase oil/gas production

  15. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Project description WORKPACKAGE No.8 (Univ. Stavanger, AGH) Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity T8.1Methods of tight gas production at the Gro field A)Use of CO2 injection for the purpose of the fracturing process of the tight gas field T8.2Carbon dioxide injection as a tool to increase oil/gas production B)Comparison of advantages of the usage IOR/IGR vs EOR/EGR T 8.3 Increase of oil recovery factor by means of natural gas injection at the Skarv field C) Increase of oil recovery factor by means of CO2 injection at the Skarv field

  16. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Deliverables

  17. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy KIC added value Innovation • the introduction of innovative seismic monitoring system for industry purposes • transportation plan • site developement plan • technology for increased exploitation of oil/gas (monograph, 3 papers) • PhD and MSc programms considering recovery methods (1-2 PhD, 3 MSc) Technology Education

  18. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Timing/deliverables

  19. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Budget

  20. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Budget - financing

  21. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Budget

  22. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Budget

  23. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Market analysis (WP0) – PGNiG, Lotos • Title: Preparation of market analysis and assessment of business opportunities. • T0.1. External market analysis. • Market analysis: the estimation of the current and future market size will be proceeded. The market capacity, potential demand and absorptivity of the new technology is going to be assessed. The prospective consumers and their motives will be determined, taking under consideration the distribution channels to the recipient. • b. Recognition of the competition structure will be performed and the risk evaluated, if new competitors are expected to appear. The value of project competitiveness will be underlined.

  24. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Market analysis (WP0) • Title: Preparation of market analysis and assessment of business opportunities. • T0.2. Consortium's internal analysis. • Assessment of material and immaterial resources capabilities of the partners partaking in the project (devices, materials, etc.), especially from among immaterial resources the importance of management capacity, institutions, reputation, etc. • b. The characteristics of the consortium's opportunities: recognition of strengths and weaknesses, which have an impact on chances of success depending on external circumstances, threats, formal legal issues risk. • c. The capabilities and outlook on generating new patents, recovered oil profit, extension of exploitation • liveliness by developing new technology.

  25. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Launching new products in a market Questions: What- service/product? Whomay be interestedin? What for? How? mainly energy companies profit, safety reasons • Creation and testing. Implementation for partner’s purpose. • Commercialization • finding the discriminatory features

  26. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Questions?

  27. KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy Thank you for your attention