Mouth Hylebos/Blair Slip 1

Mouth Hylebos/Blair Slip 1. Approximate size : 50 Acres Volume : 300,000 cy disposed in Slip 1 Contaminants : PCBs, Pb, Hg, Ni, Cu Parties performed work : Port of Tacoma and Occidental Confirmation sampling demonstrates success Further worked planned. Head of Hylebos.

tyrone
Download Presentation

Mouth Hylebos/Blair Slip 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mouth Hylebos/Blair Slip 1 • Approximate size: 50 Acres • Volume: 300,000 cy disposed in Slip 1 • Contaminants: PCBs, Pb, Hg, Ni, Cu • Parties performed work: Port of Tacoma and Occidental • Confirmation sampling demonstrates success • Further worked planned

  2. Head of Hylebos • Volume/area: excavation/capping of 5.5 acres of bank/intertidal (40,000 cy) and habitat improvements • Contaminants: Primarily PCBs, PAHs • Work performed by: General Metals and Atofina • Relocation of Hylebos Marina • Complexity of “source control” • e.g., Atofina groundwater seeps

  3. Dunlap Excavation in progress General Metals Peninsula Habitat Improvement & Adjacent Excavation Completed Wayconn Intertidal Excavation Photos 7/1/03 Dalton Olmsted Fugelvand

  4. Cleanup Work Planned for 2004 • Lockheed Shipyard • Todd Shipyard • Commencement Bay - Mouth of Thea Foss Waterway - Head of Hylebos Waterway - Mouth of Hylebos Waterway/Blair Slip 1 - Head of Middle Waterway

  5. Todd Shipyard • Area: 40 acres • Volume – est. 200,000 cy dredged • Contaminants: As, Cu, Pb, Zn, Hg, TBT, Zn, PCBs, PAH • Major source control upgrades with cleanup • Pier replacement • Create additional habitat

  6. Cleanup Work Planned for 2004 • Thea Foss • hydraulically dredge 525,000 cy of sediments • cap 21 acres • remove and replace 5 marinas • construct a new marina in front of Glass Museum • mitigation projects in the Middle Waterway, St. Paul Waterway, Puyallup River Side Channel • bank stabilization and creation of pocket beaches throughout the waterway

  7. Head of Hylebos • General Metals & Atofina Chemicals • “Precision” dredging 45 acres – 370,000 cy • Contaminants: PCBs, PAHs, metals • July 15, 2004 - February 15, 2005 • By rail to Roosevelt Regional Landfill

  8. Head of Middle Waterway • Cleanup of subsurface sediments to be conducted by DNR in summer 2004

  9. Status of Sites in RI/FS • Lower Duwamish Waterway • Portland Harbor

  10. Lower DuwamishWaterway Site Source Control Remedial Investigation Feasibility Study Early Cleanup Actions

  11. Portland Harbor Site RM 2 Portland Harbor Sampling Area River Miles 2 -11 RM 11

  12. Lori Cohen Office of Environmental Cleanup EPA/Region 10 206-553-6523 cohen.l@epa.gov