Welcome. Yuma County Airport Authority Pre-Proposal Conference Aviation Industrial Center in DCC. Two Project Opportunities. Two Potential Leads C-5 Galaxy Refit Center T-50 Export Trainer/Attack Aircraft Plus a Warm-Up. Two Recent Requests from Lockheed.
E N D
Welcome Yuma County Airport Authority Pre-Proposal Conference Aviation Industrial Center in DCC
Two Project Opportunities Two Potential Leads C-5 Galaxy Refit Center T-50 Export Trainer/Attack Aircraft Plus a Warm-Up
Two Recent Requests from Lockheed Aircraft Assembly Complex for the T-50 Aircraft Refit Complex for the C-5
C-5 Complex: 275,000 Sq. Ft. Aircraft Hangar C-5 A Galaxy Refit
FY 11 – DCC Apron Phase 2 $10.0 Million CY 2010 CY 2011 CY 2012 Sep Oct Nov Dec Jan Feb Mar Jan Apr Feb May Mar Jun Apr Jul May Aug Jun Sep Jul Oct Aug Nov Sep Dec Oct Nov Dec Ready for Development Construction 12 Months Contract Award Grant Award Bid Open / Grant Application Budget Appropriation Earmark Action Meet Congressman Grijalva
Other Available Development Space • Ready to Build • Next to CBP • Funded by Airport & Grant Funds
Aviation Industrial Center • Must be a Multi-Tenant Facility due to funding restrictions
Concept • Small Aviation Industrial Center
Two Hangars & Four Offices = Six Suite Nos. • Multi-tenant Facility • An Aviation Industrial Center Hangar Suite Offices & Shop Hangar Suite
View from Flightline Area Offices & Shop Hangar Suite Hangar Suite
Aviation Industrial Center • Budget is $4M for construction – MAX!!! • NASA Hangar was $2M
YCAA Consultant Selection Process FAA guidelines in Advisory Circular 150/5100-14d for Consultant Selection Title IX of the Federal Property and Administrative Services Act of 1949 requires that qualifications based selection procedures be used for the selection of firms to perform architectural and engineering services. The selection of consultants must be made on the basis of fair negotiations and equitable fees and through selection procedures that are professionally acceptable, ensure maximum open and free competition, and avoid any suggestion of unfair or unethical conduct.
A/E Experience Team Experience Firm’s Reputation FAA Knowledge DoD Knowledge Workload Plan Delay History Yuma Awareness Insight to Problems Level of Interest FAA Criteria (AC 150/5100-14D)
Our RFQ Package – 9 to 10 Pages • Cover Sheet • Team Member’s Background • Relevant Experience • Time Line • Technical Approach • Optional Information • Plus Illustrations
Selection Panel Example • MCAS Engineer Division Chief (retired) • Airport Chief Financial Officer • Airport Director of Operations • GYEDC Airport Liaison Consultant • Others as Required • Airport Director (Advisor, non-voting)
Scoring the Proposal • Eight of ten criteria are objective • You get points or you don’t • Scored by administrative staff • Two criteria are subjective • Selection Panel reads the narrative, looks at the entire proposal and makes a judgment. • Zero to ten points
Barry Patterson Fischer Architects Nicklaus Engineering DWL Architects Terminal Modification - 4 Firms
Armstrong Huitt Kirkham Morrison Nicklaus Wilcox Taxiway F, Y – 6 Firms
Corgan Architecture Barry Patterson EMC2 Architects C&S Engineering TranSystems Engineering DWL Architects Concourse Expansion - 6 Firms
Architecture West DWL Architecture Barry Patterson EMC2 Group Architects DCC Hangar – 4 Firms
Dibble Engineering Armstrong Consultants Morrison-Maierle C&S Engineering Rolle Field – 4 Firms
Nicklaus Armstrong Morrison-Maierle, Inc Huitt Zolar DCC Apron – 4 Firms
Armstrong Consultants C&S Engineers, Inc Crawford, Murphy & Tilly Morrison-Maierle, Inc Ricondo & Associates, Inc The Louis Berger Group Master Plan – 6 Firms
Parking Lot Reconfiguration • Direct Contract to CORE Engineering Services • Small contract, direct billing • Scope of work • Reconfigure parking lot • Restriping • Traffic Flow
RFP for Design Build Project LoCoco Pilkington Yuma Valley Pilkington Commercial Construction Yuma Pilot Center
Develop New Airport Emergency Plan • Kimley Horn • Direct Hire due to small nature of project (i.e. $15K to $20K) • Familiarity with FAA Emergency Plan guidelines
Terminal Taxiway F & Y Concourse Expansion DCC Apron Rolle Taxiway, Apron DCC Hangar Master Plan Terminal Parking Yuma Pilot Center GA Apron New Emergency Plan Taxiway Z Airfield Lighting Fischer NEI DWL NEI Morrison Architecture West Ricondo CORE LoCoco Pilkington/NEI NEI Kimley-Horn TBD TBD Our Contract History
Complaint from Community Why aren’t you using local firms?
The Team – 6 potential members, 60 Points • Emphasis on Local A/E Talent – 30 Points Architect Civil Electrical Mechanical Structural Other?
P O Relevant Experience • 10 possible references = 10 Possible Points • Points for each relevant project • One point for relevant project • Zero points for non-relevant projects • Objective: Find Capable Firm
Relevant Projects (not all inclusive) Airport Non-Airport Retail Centers Strip Malls, Shopping Malls School Buildings Government Buildings • Hangars • Terminal Projects • Runways / Taxiways • Military Construction
3. Runway Rehab • Taxiway Rehab • Runway Resurface • Gas Station Drive • Aircraft Apron Name John Smith, P.E Project Role Civil Engineer Licensed Engineer In Arizona Yes Time Req for this Project: 15% Relevant Experience. Indicate which projects on Pg 4 this person participated in this role. Projects 1* 2* 3* 4* 5* 6* 7* 8* 9* 10* Team Members – 30 Points • Ten check boxes for each team member • Half point per relevant project worked on • Objective • Stop experienced firm assigning junior/inexperienced team. =2 Points
Reputation • Ten possible points • We actually call your references • We ask specific questions about satisfaction, cost overruns (change orders) and project delays
Knowledge of FAA policies, etc • Ten possible points • One point for each obvious FAA project on the relevant experience page • Objective: Our design work must be in full compliance with FAA Advisory Circulars • The Advisory Circulars are extremely detailed and over every aspect of engineering design on runways and taxiways • A firm that is NOT familiar with the AC’s will not meet FAA design requirements