Phase IV Review Meeting ---- Curves

Phase IV Review Meeting ---- Curves. September 24, 2012. ATP 2 – Curve Radius. ATP Metro – Curve Radius. Greater MN – Curve Radius. I ncluding the portions of the Metro Counties designated as rural. Phase IV – Curve Radius.

Download Presentation

Phase IV Review Meeting ---- Curves

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase IV Review Meeting----Curves September 24, 2012

  2. ATP 2 – Curve Radius

  3. ATP Metro – Curve Radius

  4. Greater MN – Curve Radius Including the portions of the Metro Counties designated as rural.

  5. Phase IV – Curve Radius Including the portions of the Metro Counties designated as rural.

  6. ATP 2 – Curve ADT

  7. ATP Metro – Curve ADT

  8. Greater MN – Curve ADT Including the portions of the Metro Counties designated as rural.

  9. Phase IV – Curve ADT Including the portions of the Metro Counties designated as rural.

  10. Curve Critical Ranges + Critical Curve ADT for Chisago County was 1900 – 3000. * Currently suggested critical ranges.