An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONALINSTITUTUL FOR RESEARCH AND DEVELOPMENT OF IZOTOPIC AND MOLECULAR TECHNOLOGY GRID and IT atINCDTIM Cluj-Napoca Recent Progress and Prospects Ing. Farcas Felix

  2. Project IFIN for GRID ATLAS – 4 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 8 GBRam, Projekt IFIN GRID ATLAS 2 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 4 GbRam, History N E X T 2 0 0 7 Click Next

  3. Present days – in INCDTIM

  4. Patch FO Cat6 UTP Cisco Linksys 10/100/1000 Link between main buildings at 1 Gbps through a modern networking system based upon UTP Cat6 cable and FO

  5. 2 server Pentium 4, Processor 3 Ghz, 2 GBRam, HDD 150 GB - a communication /web / mail server - a Database server SO Linux Centos

  6. Switch Layer 3 Cisco 3750 Module 1 Gbps Connection Module 1/10 Gbps

  7. Fibra optica single mode Link activ in tests A link to the main RoEduNet Cluj – Napoca node with a speed of 1 Gbps ~ Dark Fiber ~

  8. Present – in GRID

  9. 12 servers dual processor dual core 6 servers dual processor quad core dual core quad core

  10. 2 Rack, 42U Model to be bought in the near future, till the end of the year Rack in use without walls

  11. front view Back view UPS 5000 Va

  12. SAN Storage Area Network Capacity 4 TB Server – Pentium 4, single processor 1.6 Gb, HDD 2x80 Gb

  13. Future is looking bright

  14. Projekt for a New Website

  15. 15.11.2007 23.11.2007 26.11.2007 Finishing the Datacenter

  16. Obtaining the certificates for User, Host & RA – Manager Starting RO-ITIM-CJ Grid Site

  17. New technology with the possibility to be used in GRID in the very near future • BLADE system • Less power use • Less space occupied • Less management cost • Virtualization