An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEG Software Status-for the coming review committee-Question from A.BlondelOur answerSchedule and Man power MEG Software Group

  2. Question from A.Blondel • Give a common goal to be achieved by the next review; “I have appreciated the presentation of the offline software team, with a team leader etc... As promised I come forth with the question: could you give us -- and yourself -- a common goal to be achieved with that software in time for the next review?”

  3. The Answer • MC unified framework • With double option: Tokyo or Pisa • Test on reduced number of PMTs • Large Prototype MC unification • CEX beam test • Same offline package for DATA & MC • Event Display • Initially GEANT3

  4. MC Framework - the MC unified framework (with the double option: Tokyo or Pisa) of the final detector should be ready (or almost ready) for the next meeting at PSI; therefore, the test on reduced number of PMTs could be done in the separate programs and in the unified framework as check;

  5. MC Framework for MEG(1) • Unified framework with double option: • Tokyo or Pisa code, • Framework based on: • Fortran 77, • CERNLIB, • ZEBRA, • GEANT3, • Distributed via CVS.

  6. MC Framework for MEG(2) • Tree structure & skeleton … ready; • Materials & tracking medium … merged; • Event generator … stand alone & built-in; • DC, TC, Magnet and B field … merged; • ZEBRA structure … in progress; • Scintillation photon tracking … in progress.

  7. To be done: MEG MC • Merge Liq. Xe Geometry; • Test w/reduced number of PMT in Liq. Xe; • Digitization for all the sub detectors; • Full reconstruction program; • Offline database… ODB? Separate database (e.g.PostgreSQL, MySQL, etc.)?

  8. Lproto CEX beam test - the same work will be done for the Large Prototype MC, probably in time for the October beam test; the Large Prototype data and MC will be analyzed with the same offline package;

  9. LProto CEX beam test • MC merge into the new framework… just finished. • Common output format for DATA/MC; • Scintillation photon tracking in Liq. Xe… Full ray tracing or geometrical tracking; • Reflection on the PMT quartz window… Fresnel or total reflection; • Scintillation light spectrum… Monochromatic, Gaussian, Basov et.al, etc. • Rayleigh scattering/absorption in Liq. Xe.

  10. To be done: beam test • NaI response simulation; • LiH target and Vessel simulation; • Phase space simulation for p0; • Offline database … ODB? Separate database (e.g. PostgreSQL, MySQL, etc.)?

  11. Event Display - the MC event display in the unified framework will be written by using GEANT3, while for the general event display (useful for on-line also) the final decision will be taken later.

  12. Schedule & Man Power (1) • Present a realistic schedule by the review committee • By when will each sub detector part be ready?e.g. Is the DC simulation ready by the coming DC beam test? • Assignment?

  13. Schedule & Man Power (2) • Liq Xe … G.Signorelli,S.Yamada • Drift Chamber … F.Cei, H.Nishiguchi • Timing Counter … P.Cattaneo • Target/Beam … P.-R. Kettle • Magnet … W.Ootani • Trigger … D.Nicolo