1 / 17

ENERGY & SUSTAINABLE DEVELOPMENT

IRADe Energy Conclave 2006. ENERGY & SUSTAINABLE DEVELOPMENT. Rural Electricity Services: Institutional Arrangements for Sustainability. Salman Zaheer The World Bank. New Delhi July 28, 2006. Structure of Presentation.

umika
Download Presentation

ENERGY & SUSTAINABLE DEVELOPMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRADe Energy Conclave 2006 ENERGY & SUSTAINABLE DEVELOPMENT Rural Electricity Services:Institutional Arrangements for Sustainability Salman Zaheer The World Bank New Delhi July 28, 2006

  2. Structure of Presentation • Three Major Challenges of Rural Electrification and how some countries have addressed them • High Cost of Electrification • Policy & Regulation • Supervision & Service Quality • India’s approach • Evolving World Bank Engagement

  3. Rural ElectrificationChallenges and Impacts

  4. Rural ElectrificationChilean Experience

  5. Rural ElectrificationChilean Experience Results and Lessons • Coverage: 53% => 76% in 7 years with private financing • Service quality and financial sustainability achieved • Cost of expansion 30% lesser than program estimates • Instilling commercial incentive for improving access and service was the key feature of the program; • Demand driven nature supports future financial viability • Competition for viable rural businesses kept costs down, reduced fiscal burden, attracted private financing

  6. Rural ElectrificationBangladesh Experience

  7. Rural ElectrificationBangladesh Experience Results and lessons • Since 1980 67 PBSs serving 3.5 million customers established • Connections increased from 0.7 million in 1992 with over 0.5 million new connections being added now (vs 0.2 m in 1990s) • Sound technical and commercial performance achieved due to community involvement and despite higher than urban tariff • Other than the larger PBS’, most PBSs operate at a loss and depend on operating cross-subsidy from REB • In recent years increasing politicization and pressure to dilute economic criteria • REB-PBS model needs updating • Growing gap between demand and supply an additional problem

  8. Rural ElectrificationThailand Experience

  9. Rural ElectrificationThailand Experience Results and lessons • Access:10% in 1972 => 80% in 1992; 97% villages electrified • Villages contributed substantially to capital cost (based on paying capacity) to ensure rapid electrification • 25% villages contributed 30% of project cost, including from individuals and local development funds • PEA financed a major part of the program through internal resources (in some years 40 – 70%) and raised commercial loans for some schemes • Strict use of financial criteria in prioritizing schemes helped make the program sustainable • Sound technical, commercial and financial performance achieved

  10. Rural ElectrificationGuatemala Experience

  11. Rural ElectrificationGuatemala Experience Results and lessons • 122,000 new rural connections made between May 1999 and May 2002 • Commercial incentive to serve rural consumer ensured; • Output based aid helped ensure utility performance before receiving subsidy; • A criticism against the program has been that subsidy was made available only to existing discoms thereby restricting alternate supply providers

  12. Rural Electrification India : RGGVY

  13. Rural ElectrificationIndia: Challenges ahead • Aggressive connection targets • 100% households by 2012 => creates supply-side pressure • Uncertain financial sustainability • Limited consumer mobilization or participation • Tariff rationalization during program implementation • Slow pace of franchisee development • Regulation, Monitoring & Evaluation – procedures/entities not in place • Limitations of heavy-handed “cost plus” regulation • High potential for mis-targeted and “leaked” subsidies • Link program to broad rural development outcomes – farm & non-farm incomes; health services & education • Capacity building at all levels – local government, village level, and district committees • Overall power scarcity - Bold political leadership to balance sector’s economic & social objectives for long-term sustainability

  14. RE Challenge - Transitioning from vicious cycle, where customer is a liability……. • Supply rationing • Inadequate O&M • Poor supply & service quality • Rising Incentive for theft & collusion • More electricity needed to meet increasing demand • BUT… • Low cost recovery • Declining ability to contract new power • FURTHER DETERIORATION IN: • Tariff collection • Financial condition • Ability to contract additional power

  15. ……to a virtuous cycle, where customers progressively become assets……. • Enhanced prospects for attracting credible service providers/franchisees • Assured supply to full cost paying customers • Rationing for subsidized customers or mechanisms for targeted subsidies • Increased economic activity, employment & local incomes • At least self-sustaining O&M costs recovered from customers • Mechanisms for self-regulation – benchmarking, etc. • Increased prospects for contracting additional power from grid and local sources • Maintain service quality and financial viability

  16. World Bank Program being identified…selective & strategic • State-level power reform – key bottleneck in sustainable sector development • Capacity building for governance & regulatory effectiveness • Rural energy services – for inclusive growth • Village Energy Security Program - cooking & lighting options • Distributed Generation to improve “last mile” electricity services • Power Transmission System Development • Link power generation (including clean hydro) with load centers • Promote competition - attract investment into generation • Generation expansion and emission reduction • 1,500 MW of hydropower (out of plan 16,000 MW) and 1,000 MW of thermal plant R&M (out of potential 20,000 MW) • Strengthen institutional capacity and show case good practices

  17. THANK YOU!