50 likes | 223 Views
Reports and Forms. AM Standard Operating Procedures. TACS / Attendance. TACS Clock Ring Errors Unauthorized Overtime Employee Moves Hours By Type Tour Deviations Attendance Control PS 3971. DOIS. Route/Carrier Daily Performance/Analysis Report Workload Status Report
E N D
Reports and Forms AM Standard Operating Procedures
TACS / Attendance • TACS • Clock Ring Errors • Unauthorized Overtime • Employee Moves • Hours By Type • Tour Deviations • Attendance Control • PS 3971 Reports and Forms
DOIS • Route/Carrier Daily Performance/Analysis Report • Workload Status Report • PS 1571 - Undelivered Mail Report • PS 1813 - Late Leaving and Returning Report • PS 3996 - Carrier - Auxiliary Control Report Reports and Forms