Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete Tiziana Ferrari INFN CNAF CCR, Roma, 20-21 Ottobre 2005. Service Challenge 3. Now in SC3 Service Phase (Sep – Dec 2005) ALICE, CMS and LHCb have all started their production
E N D
Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete Tiziana Ferrari INFN CNAF CCR, Roma, 20-21 Ottobre 2005 Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
Service Challenge 3 • Now in SC3 Service Phase (Sep – Dec 2005) • ALICE, CMS and LHCb have all started their production • ATLAS are preparing for November 1st start • Service Challenge 4: [May 2006, Sep 2006] Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
SC3: INFN Sites (1/2) • CNAF • LCG File Catalogue (LFC) • File Transport Service (FTS) • Myproxy server and BDII • Storage: • CASTOR with SRM interface • Interim installations of sw components from some of the experiments (not currently available from LCG) - VObox Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
SC3: INFN sites (2/2) • Torino (ALICE): • FTS, LFC, dCache (LCG 2.6.0) • Storage Space: 2 TBy • Milano (ATLAS): • FTS, LFC, DPM 1.3.7 • Storage space: 5.29 TBy • Pisa (ATLAS/CMS): • FTS, PhEDEx, POOL file cat, PubDB, LFC, DPM 1.3.5 • Storage space: 5 TBy available, 5 TBy expected • Legnaro (CMS): • FTS, PhEDEx, Pool file cat., PubDB, DPM 1.3.7 (1 pool, 80 Gby) • Storage space: 4 TBy • Bari (ATLAS/CMS): • FTS, PhEDEx, POOL file cat., PubDB, LFC, dCache, DPM • Storage space: 5 TBy available • LHCb • CNAF Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
INFN Tier-1: SC4 short-term plans (1/2) SC4: storage and computing resources will be shared with production • Storage • Oct 2005: Data disk • 50 TB (Castor front-end) • WANDisk performance: 125 MB/s (demonstrated, SC3) • Oct 2005: Tape • 200 TB (4 9940B + 6 LTO2 drives) • Drives shared with production • WANTape performance: mean sustained ~ 50 MB/s (SC3, throughput phase, July 2005) • Computing • Oct 2005: min 1200 kSI2K, max1550 kSI2K (as the farm is shared) Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
INFN Tier-1: SC4 short-term plans (2/2) • Network • Oct 2005: • 2 x 1 GEthernet links CNAF GARR, dedicated to SC traffic to/from CERN • Future: • ongoing upgrade to 10 GEthernet, CNAF GARR, dedicated to SC • Usage of policy routing at the GARR access point • Type of connectivity to INFN Tier-2 under discussion • Backup link Tier-1 Tier-1 (Karlsruhe) under discussion • Software • Oct 2005: • SRM/Castor and FTS • farm middleware: LCG 2.6 • Future: • dCache and StoRM under evaluation (for disk-only SRMs) • Possibility to upgrade to CASTOR v2 under evaluation (end of year 2005) Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
What target rates for Tier-2’s? • LHC Computing Grid: Technical Design Report • Access link at 1 Gb/s by the time LHC starts • Traffic 1 Tier-1 1 Tier-2 ~ 10% Traffic Tier-0 Tier-1 • Estimations of traffic Tier-1 Tier-2 represent an upper limit • Tier-2 Tier-2 replications will lower loan on the Tier-1 *WSF: with safety factor Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
TDR: bandwidth estimation • LHC Computing Grid Technical Design Report (giugno 2005):http://lcg.web.cern.ch/LCG/tdr/ Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
Expected rates (rough / with_safety-factor) Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
Necessita’ vs specifiche Tier-2 Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
The Worldwide LHC Computing GridLevel 1 Service Milestones • 31 Dec 05 • Tier-0/1 high-performance network operational at CERN and 3 Tier-1s. • 31 Dec 05 • 750 MB/s data recording demonstration at CERN: Data generator disk tape sustaining 750 MB/s for one week using the CASTOR 2 mass storage system. • Jan 06 – Feb 06 • Throughput tests • SC4a 28 Feb 06 • All required software for baseline services deployed and operational at all Tier-1s and at least 20 Tier-2 sites • Mar06 • Tier-0/1 high-performance network operational at CERN and 6 Tier-1s, at least 3 via GEANT. • SC4b 30 Apr 06 • Service Challenge 4 Set-up: Set-up complete and basic service demonstrated, capable of running experiment-supplied packaged test jobs, data distribution tested. • 30 Apr 06 • 1.0 GB/s data recording demonstration at CERN: Data generator disk tape sustaining 1.0 GB/s for one week using the CASTOR 2 mass storage system and the new tape equipment. • SC4 31 May 06 Service Challenge 4: • Start of stable service phase, including all Tier-1s and 40 Tier-2 sites. Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
The Worldwide LHC Computing GridLevel 1 Service Milestones • The service must be able to support the full computing model of each experiment, including simulation and end-user batch analysis at Tier-2 sites. • Criteria for successful completion of SC4: By end of service phase (end September 2006) • 8 Tier-1s and 20 Tier-2s must have demonstrated availability better than 90% of the levels specified the WLCG MoU [adjusted for sites that do not provide a 24 hour service] • Success rate of standard application test jobs greater than 90% (excluding failures due to the applications environment and non-availability of sites) • Performance and throughput tests complete: Performance goal for each Tier-1 is • the nominal data rate that the centre must sustain during LHC operation (200 MB/s for CNAF): • CERN-disk network Tier-1-tape. • Throughput test goal is to maintain for one week an average throughput of 1.6 GB/s from disk at CERN to tape at the Tier-1 sites. All Tier-1 sites must participate. • 30 Sept 06 • 1.6 GB/s data recording demonstration at CERN: Data generator disk tape sustaining 1.6 GB/s for one week using the CASTOR mass storage system. • 30 Sept 06 • Initial LHC Service in operation: Capable of handling the full nominal data rate between CERN and Tier-1s. The service will be used for extended testing of the computing systems of the four experiments, for simulation and for processing of cosmic-ray data. During the following six months each site will build up to the full throughput needed for LHC operation, which is twice the nominal data rate. • 24 hour operational coverage is required at all Tier-1 centres from January 2007 Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
Milestones in brief • Jan 2006: • throughput tests (rate targets not specified) • May 2006: • high-speed network infrastructure operational • By Sep 2006: • avg throughput of 1.6 GB/s from disk at CERN to tape at the Tier-1 sites (nominal rate for LHC operation, 200 MB/s for CNAF) • Oct 2006 – Mar 2007: • avg throughput up to twice the nominal rate Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete
Target (nominal) data rates for Tier-1 sites and CERN in SC4 Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete