330 likes | 899 Views
13. Equipment Selection; Variable Air Volume ; Temperature Controls; Water and Steam Piping. Chapter 3 and 7 (Toa). 14. HVAC System Design; Entering Web Bulb; Coil Lines; Zoning; Duct; Variable Air Volume, Constant Air, Registers . Chapter 6 (Toa). Zoning. HVAC 13a CNST 305
E N D
13 Equipment Selection; Variable Air Volume ; Temperature Controls; Water and Steam Piping Chapter 3 and 7 (Toa) 14 HVAC System Design; Entering Web Bulb; Coil Lines; Zoning; Duct; Variable Air Volume, Constant Air, Registers Chapter 6 (Toa) Zoning HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Air Volume vs Temperature • Constant Volume (CV) • Variable Air Volume (VAV)
Systems for Zone Control • Constant Temperature, Variable Volume (on,off) • Single Zone CV • Single Zone Reheat CV • CV Terminal Reheat • CV Dual Duct and Multizone • Multiple Zone VAV • ETC.
Single Zone CV Air Control on/off Air conditions controlled at thermostat for entire zone
Diffusers Water Tower Air Handler Exhaust Fan T Pumps Air Handler Absorber Chiller Chiller Perimeter Heating Boiler System Controls Single Zone CV
T T T VAV Reheat Roof Top Air Conditioners w/ Boilers
T T T Multiple Zone VAV Roof Top Single Packaged Unit Bypass Damper
T T T Multiple Zone VAV Water Tower Fan Powered VAV Terminals Diffusers Self-Contained Air Conditioner Boiler
Water Tower Exhaust Fan VAV Terminals Diffusers T T T Air Handlers Absorber Chiller Pumps Chiller Boiler System Controls Multiple Zone VAV Building Management System
VAV Terminals Diffusers Chill Water AH T T Hot Water AH Direct Fired Absorber Chiller System Controls VAV Dual Duct Building Management System
Next Time Duct Systems