Disaster Recovery. Disaster Recovery Program. Knowing what to do when systems “go down” so that disruption is minimized Having a documented plan and practice Moving beyond mainframe systems to focus on the growing number of Unix and Intel server applications. Systems / Applications.
E N D
Disaster Recovery Disaster Recovery
Disaster Recovery Program • Knowing what to do when systems “go down” so that disruption is minimized • Having a documented plan and practice • Moving beyond mainframe systems to focus on the growing number of Unix and Intel server applications Disaster Recovery
Systems / Applications Disaster Recovery
DR Objectives • Q/A existing data • Add new applications • Drop applications that have been sunset • Check data for completeness and accuracy • Y=Yes, N=No • Date of Most Recent Recovery Test • Ensure Operating System (L) and Data Base (M) version are up-to-date. Disaster Recovery
DR Spreadsheet Inventory • Changed Columns • Classification (C) 1-Fatal, 2-Critical, 3-Manageable, 4-Marginal Numbers added to facilitate sorting • New Columns • (K) Platform Type: M=Mainframe, U=Unix, I=Intel, O=Other • (Q) Comment: To be used for comments • (T) Agency Contact Name • (U) Agency Contact Phone number • (V) Application Dependencies: Does this application depend on another to function. Disaster Recovery
Application Impact Categories • 1-Fatal - agency will be unable to complete required legal obligations or business functions Many people would be affected, either inside or outside the agency. • Potential liability exists. • 2-Critical – agency will continue to operate partially. Calculations will produce incorrect results. Workarounds are short-term and highly invasive until the problem is resolved. • 3-Manageable - agency will continue to operate partially or some calculations will produce incorrect results. However, could be sustained for a longer period of time. • 4-Marginal - minor inconvenience, annoyance, or irritation. Business will continue to function. Disaster Recovery
System / Application Categories Disaster Recovery
Agency Documented Recovery Plans Disaster Recovery
Last Disaster Recovery Test • Very successful mainframe test • Increased Agency participation • Limited Unix testing Disaster Recovery
2003 Applications Tested/Not Tested Disaster Recovery
Where We really Are Disaster Recovery
Challenges • Need to create and maintain Recovery Plans for Fatal and Critical applications • Agencies to plan with OIR “unmet needs” for non-mainframe Fatal and Critical systems • Encourage Agencies to test more mainframe systems Disaster Recovery
OIR DR Contacts Larry.K Peck Information Systems Disaster Recovery Consultant 532-0920 Van Moffatt Director MTS and Disaster Recovery 741-1436 Disaster Recovery