CHARGE. To develop conceptual designs for statewide AOOS system and 3 AOOS regions: Arctic, Bering Sea/Aleutian islands, and Gulf of AlaskaUse past stakeholder workshops, existing priority lists (e.g., state, NPFMC, NPRB, NSSI), existing draft plans,
E N D
1. AOOS Conceptual Design Overall Plan and Approach 1
2. CHARGE To develop conceptual designs for statewide AOOS system and 3 AOOS regions: Arctic, Bering Sea/Aleutian islands, and Gulf of Alaska
Use past stakeholder workshops, existing priority lists (e.g., state, NPFMC, NPRB, NSSI), existing draft plans, & FY07-09 proposal as starting point
Designs should include ranking/prioritization to guide phased implementation
Designs will guide FY 08-10 funding proposal due November 2007 2
3. PROCESS & Timeline Develop draft designs/plans (now thru July 1)
Organize small teams to review & refine designs for each region (July 1 – Aug 7)
Teams meet concurrently & jointly to finalize drafts, assess technical/scientific priorities (Aug 8-9 tentatively)
Develop final drafts (Aug 9-15)
Drafts circulated to larger audience for review (Aug 15 – Sept 15)
3
4. PROCESS & Timeline cont. ISER contractors research prioritization criteria & develop proposed methodology (June 6 – Aug 1)
AOOS board approves methodology (early to mid Aug)
ISER organizes small team to prioritize components in conceptual designs using approved methodology (Sept 1-30)
Staff prepares final recommended plan for AOOS board consideration (Oct 1-15)
AOOS board meets for final action (Oct 15)
Develop FY 08-10 funding proposal (Oct 15-Nov 15)
4
5. EXPERT TEAMS: suggestions Arctic: Mark Johnson, Hajo Eicken, Warren Horowitz, Glenn Sheehan, David Atkinson, Ignatius Rigor, NWS, Lawson Brigham
Bering Sea/Aleutians: Tom Weingartner, Jim Overland/Phyllis Stabeno/Jeff Napp, Joe Spader, Doug Woodby, NWS, USCG, BSFA, Francis Wiese, David Atkinson, Stephanie Madsen, John Oswald
GOA: Orson Smith, Yi Chao, Phil Mundy, Sue Saupe, Carl Schoch, NPFMC, Gordon Kruse, NWS, EPA/DEC, Bill Bechtol, John Oswald, USGS
Ranking System team: ISER, Sea Grant, national IOOS, Coastal Services Center, Keith Criddle, industry (e.g., Lockheed, Raytheon, Boeing)
5
6. Conceptual Design Outline Volume I. Introduction & executive summary
Volume II. Statewide
Volume III. GOA
Volume IV. Bering Sea/Aleutians
Volume V. Arctic
Volume VI. National & Global Role of AOOS
6
7. Statewide Statewide role
Intro to AK regions, LMEs, state coastal waters
Description of physical ocean characteristics
Description of biological ocean characteristics
Statewide user needs
Priority user info products & gaps in providing them
AOOS obs platforms to provide products
AOOS forecast models to provide products
R&D needs, pilot projects
Centralized data management & analysis
DMAC
Data management
Data dissemination
Data interpretation & analysis
Education and outreach
R&D needs, pilot projects
References
List of acronyms 7
8. Region X Introduction
Geography & oceanography
Regional characteristics
Resources & human uses: stakeholders
Role of AOOS at regional scale
Issues
Products
Observational arrays
Modeled forecasts
Role of AOOS at sub-regional scale
Education and outreach
R&D needs, pilot projects
References
List of acronyms 8
9. Sub-region X Main issues of concern
Products requested from stakeholders
AOOS obs platforms to provide products
AOOS forecast models to provide products
9
10. Conceptual Design Spreadsheet Design components organized by
Region
Subregion
Societal goal
Issue
Stakeholder
Product
Existing observations
Observation gaps
Existing models
Model gaps
Status
Priority (from a scientific/technical perspective) 10