VLT $0.67B
Upgrades $5.75B. Growth $1.26B. VLT $0.67B. Cheap seal @ year 7, 14 Overlay @ year 20 20-year cost: $180,000. Rehabilitation cost: $320,000. Reconstruction cost: $660,000. COMPARISON BETWEEN AACE STUDIES. EXPENDITURES. ● Maintenance and Operations. Roads Bridges. ● Safety.
320 views • 17 slides