1 / 14

AERONAUTICAL COMMUNICATIONS PANEL (ACP) 15th MEETING OF WORKING GROUP M

AERONAUTICAL COMMUNICATIONS PANEL (ACP) 15th MEETING OF WORKING GROUP M Montreal, Canada 16 – 18 November 2009. Agenda Item: 1a. Data Communications Program Status (Presented by: Peter Muraca, FAA). Agenda. Functional System View Program Timeline FAA Acquisition Lifecycle

ursa
Download Presentation

AERONAUTICAL COMMUNICATIONS PANEL (ACP) 15th MEETING OF WORKING GROUP M

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AERONAUTICAL COMMUNICATIONS PANEL (ACP) 15th MEETING OF WORKING GROUP M Montreal, Canada 16 – 18 November 2009 Agenda Item: 1a Data Communications Program Status (Presented by: Peter Muraca, FAA)

  2. Agenda Functional System View Program Timeline FAA Acquisition Lifecycle Near Term Activities Milestones & Activities (Leading to FID) SC-214/WG-78 Standards Development Segment 1 and Segment 2 Services (Summary)

  3. Functional System View Program Scope FAA System Scope User System Scope 5.0 6.0 7.0 2.0 Ground 3.0 Ground 4.0 Air- 1.0 Ground Airborne Airborne Airborne Data Message Ground User Message Data User Processing Delivery Message Interface Delivery Processing Interface (GDP) (GMD) Delivery (GUI) Controller Flight Crew (AMD) (ADP) (AUI) (AGMD) • FAA System Scope • Program funds enhancements required to perform data communications in: • Ground User Interface (e.g. ERAM/DSR display software) • Ground Data Processing (e.g. application software to create clearances) • Ground Data Delivery (e.g. wide area networking between ground facilities) • Ground components of A/G Message Delivery (e.g. radio, ground antenna) • User System Scope • Users fund enhancements required to perform data communications in: • Airborne components of A/G Message Delivery (e.g. aircraft radio, antenna) • Airborne Message Delivery (e.g. aircraft networking) • Airborne Data Processing (e.g. app s/w in comm & flight management units) • Airborne User Interface (e.g. cockpit displays & s/w)

  4. Program Timeline En Route Keysite  Identify Automation Contract Final Investment Decision Air Ground Network and Tower Automation Investment Analysis Readiness Decision Schedule not baselined until Final Investment Decision Tower Keysite 16 18 20 10 12 14 2022 2008 Release Air Ground Network RFP Final Investment Decision Segment 2 TRACON Keysite Final Investment Decision for En Route Automation  Initial Investment Decision

  5. RFP A/G subnet release 2010 • A/G subnet and Tower Automation FID 2011 • En-Route Seg 1 FID 2012 Program lifecycle (FID) Final Investment Decision(s) (IID) Initial Investment Decision (FSD) Full Scale Development 2011 (IARD) Investment Analysis Readiness Decision • Tower automation initial site 2014 • En-Route initial site 2016 • Contract Award A/G Subnet Near Term Activities - Develop Specifications • Develop and Release SIR(s) • Receive and Evaluate proposals- Mid-term Human Factors and Standards- Finalize Business Case Analyses- Complete JRC Final Investment Decision(s) • Contract Awards • Complete Service Level Agreements • Complete Safety Assessments • Complete Initial Requirement Documents • Complete Initial Cost Benefit Analysis • Complete JRC 2A, Initial Investment Decision

  6. Near Term Activities • Standards Development (RTCA SC-214 / EUROCAE WG-78) • Safety and Performance Standards • ATN INTEROP • FANS INTEROP • Specifications Development • Parallel development of DCNS (A/G Subnet) and Automation (Tower / En-Route) Specifications, IRDs.. • Human Factors • En Route & Tower human-in-the-loop studies for Segments 1 and 2 services • DCNS Screening Information Requests (SIR) Development • Released “Draft” SIR in August 2009 • Release FINAL SIR in April 2010

  7. FY09 Primary Activities

  8. FY10 Primary Activities

  9. SC-214/WG-78 Standards Development CM / CPDLC = Logon, ACM, ACL, DCL, AMC, D-TAXI ADS-C and CPDLC = 4D TRAD, FLIPINT, ITP, M&S, C&P, PAIRAPP FIS = D-OTIS, D-RVR, D-RVR, HZWX, D-ATIS www.faa.gov/go/sc214 WP1 & WP2 Dec 09 WP1 Draft April 09 WP1 + WP2 StandardsPublication 2008 2009 2010 2011 D-RVR HZWX

  10. Segment 1 Services (2014 – 2018) • Departure Clearances (DCL) including revisions transmitted to the aircraft on the ground • Enables full route clearances and revisions • Exploits Future Air Navigation Systems (FANS) avionics services • Digital Automatic Terminal Information Service (D-ATIS)up-links of airport weather, hazards, and restrictions to the aircraft • Air Traffic Control Clearances (ACL), instructions, and notifications provided in a textual format (data messaging) between controllers and pilots • Data link logon (DLL) service to provide a unique digital identification of every aircraft • Initial use of 4-D Trajectory Clearances clearances for continuous descent approaches • Automatic ATC “hand-off” (ACM) data transmitted to aircraft identifying the radio frequency in use by the next air traffic control sector • r Traffic Control clearances (ACL), instructions, and notifications provided in a textual format (data messaging) between controllers and pilots

  11. Segment 2 Services (2018 +) • Continue Segment 1 services in Tower and En Route • Extend Segment 1 services to TRACON • Plus additional services: • 4-D Trajectory Agreements in Performance Based Airspace, providing conflict-free flight with stable aircraft routing • Conformance Management to ensure aircraft comply with 4-D agreements • NAS Airport status, delays and constraints, hazardous weather uplinked to the aircrew • Taxi-in / Taxi-out service provides taxi routes for aircraft to follow from the gate to the runway

  12. Avionics • Leveraging significant existing equipage base (e.g., FANS 1/A+ over VDL-2) • Supports early services and benefits (e.g., DCL) TOWER • Working with avionics manufacturers and service providers to determine how far these avionics can carry us into Segment 2 services • Working with avionics manufacturers to develop SC-214/WG-78 avionics fully NextGen capable avionics • Draft standard complete in Dec 2009 • Standards validation work planned for 2010/11

  13. BACK-UP

  14. Data Comm Capabilities – Globally Harmonized 2010 2015 2020 2025 Existing Aircraft Capabilities (FANS 1/A+, ATN CPDLC, …) Aircraft Equipage Avionics Standards Avionics Available 214/78 Equipage Segment 1 Segment 2 Segment 3 DC In Tower DC In En Route NextGen Equipage Rule DC In TRACON Operational Capabilities • Original;/Revised Departure Clearances, D-ATIS • TRACON Data Comm Including Routine Clearances, Comm Mgmt, Optimized Descents & Time Based Metering, • Clearances • D-Taxi Out & In • Widespread 4-D Agreements • Comm Mgmt • TFM Reroutes • Time Based Metering • Conformance Management Red = Terminal Function Black = En Route Function Purple = Cross Domain Function • Operational Terminal Info Service • NAS Status / Delays / Constraints / Sequencing & Hazardous WX • Optimized Descent (TAP/CDA) Validations • Widespread Delegated Separation = Merging & Spacing (M&S), Crossing and Passing (C&P), In-Trail Procedures (ITP), Paired Approaches (PAIRAPP) • Initial Trajectory Based Ops European Deployment A/C Forward Fit Rule Core Europe Ground Systems A/C Retrofit Rule / All Europe Ground Systems LINK 2K+ 4DLINK / SESAR SESAR Implementation Package 1 Implementation Package 2 Implementation Package 3 • Complex Clearances • En Route ATC Clearances • Widespread 4-D Agreements • Conformance Management • Comm Mgmt • ATC Microphone Check • Widespread M&S / C&P / ITP / PAIRAPP • Taxi-Out & In; Terminal Info • TAP/CDA’s • Initial TAP/CDA’s

More Related