70 likes | 211 Views
North London Network Management Unit. Why do we replace gas mains ?. 1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE. Neil Shaw/v.1./30 January 2002. North London Network Management Unit. Mains Incidents 1976 to 2001. Trend Line.
E N D
North London Network Management Unit Why do we replace gas mains ? • 1970’s – King Inquiry • 1995 – Maintain Safety Level - HSE • 2001 – Precautionary Approach - HSE Neil Shaw/v.1./30 January 2002
North London Network Management Unit Mains Incidents 1976 to 2001 Trend Line
North London Network Management Unit Regional Breakdown Neil Shaw/v.1./30 January 2002
North London Network Management Unit Minimising Disruption • Ofgem have capped our allowed costs for 2002 – 07 = Incentive to reduce cost= reducing • excavations • Decommission only where possible ratio target 1:1.1 lay:decommission • Use no – dig techniques where possible typically50 – 60% achieved Neil Shaw/v.1./30 January 2002
North London Network Management Unit Summary • Safety • Precautionary approach applied by HSE under Pipeline Safety Regulations • Regulatory Incentive to reduce cost = reduceexcavation • Aim to minimise disruption by use of non digtechniques Neil Shaw/v.1./30 January 2002
North London Network Management Unit Neil Shaw/v.1./30 January 2002