1 / 7

Upgrade Result Approval: CMS and Tracker

Upgrade Result Approval: CMS and Tracker. Frank and Andrea. Upgrade results approval: CMS proposal. CMS Upgrade Management has decided to extend to “ALL” Upgrade results the approval process applied to CMS performance results Pre-approval in the DPG meeting

urvi
Download Presentation

Upgrade Result Approval: CMS and Tracker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upgrade Result Approval:CMS and Tracker Frank and Andrea Pixel phase 1 MB

  2. Upgrade results approval: CMS proposal • CMS Upgrade Management has decided to extend to “ALL” Upgrade results the approval process applied to CMS performance results • Pre-approval in the DPG meeting • Approval in a Friday Run Coordination meeting • Results are appended to the Weekly General Meeting agenda the week after in case of last minutes comments • Approved results are posted in a public twiki managed by the DPG: at this point they can be shown in conferences Pixel phase 1 MB

  3. Some remarks • What’s behind the (proposed) approval process: • The results are posted in a stable form for a while before any step: about a couple of weeks long process • The (pre-)approval events have to be advertized widely (hypernews) • Anyone in CMS should be allowed to express its opinion • The (public) official repository helps the speakers and the managers to define the “official” results • Present Tracker performance results have always been approved using the CMS rules and everybody seems to be happy about that • CMS upgrade managers may not be aware of the wide range of “upgrade results” when they assume that “all” the results have to go through this process • The usual problem caused by a formal approval process is that the conference talk is always “in a few days” • The usual problem caused by a lack of approval process is that it may happens that wrong, misunderstood or controversial results are presented in a conference and that recovering could be a waste of time Pixel phase 1 MB

  4. A Tracker counter-proposal? • We are thinking about a counter-proposal to be made to the CMS Upgrade manager to reduce the load • We have had many upgrade talks with results since a while and they may not be aware of that • We produce results which would fit in Tracker-only papers: why not a Tracker-only approval? • This proposal should not be too much different, eventually, from the scrutiny of the slides of the talks. • The proposal • A lighter, tracker-only, approval process • The definition of a list of results which require only the light approval • But if the phase 1 and phase 2 MB’s want to adopt the CMS rules in all the cases it would be even simpler… Pixel phase 1 MB

  5. Approval processes • The CMS official one • The Tracker-only one: • Any L3 (or more)-chaired meeting can host an approval session • Upgrade simulation, TK general, DPG, phase 1 or phase 2 general or working meetings • But it has to be announced as an approval session via HN • If the results to be approved are posted one week in advance they can be approved during the meeting • If the results are posted too close to the meeting one week waiting time has to be granted to allow for comments. The chair of the meeting will take care of the follow up offline • Once approved the results are posted in an official repository (twiki page). • There is no need to have this page public outside CMS • No approval but documents posted in the official repository Pixel phase 1 MB

  6. Result categories • POG – tracking; b-tagging • upgraded detector performance results: TDR-like, based on CMSSW simulations • track multiplicity simulations: with CMSSW, with and without detector effects • expected dose simulation • relevant test-beam results • sensor design: motivations • descriptions, parameter tables, processes • sensors/chip characterization: electrical, with sources, irradiation • sensor/chip characterization: test beam • basic detector/sensor/chip (expected) performance from non-CMSSW simulations: TCAD, radiation effect, hit efficiency, charge collection, data losses • upgrade detector performance results based on non-CMSSW simulations: thermal/mechanical behaviour,… • non-CMSSW simulation validation with non-CMS data • tkLayout tool results • schedule & plans • pictures of set-ups • upgraded detector/module/chip layouts: drawings, concept Pixel phase 1 MB

  7. Summary • We need feedback from the Tracker Upgrade MB’s (soon) before replying to the CMS management • If agreed we have to start to prepare the official repository with the help of the working group conveners • Anastasia can help • if she does not receive (too many) conflicting inputs… Pixel phase 1 MB

More Related