1 / 1

Why HPS at 220 meter with TOTEM

Why HPS at 220 meter with TOTEM. Why we believe HPS @ 220m with TOTEM is the only possibility:

urvi
Download Presentation

Why HPS at 220 meter with TOTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Why HPS at 220 meter with TOTEM • Why we believe HPS @ 220m with TOTEM is the only possibility: • The Hamburg Beam pipe will delay the project past 2015. There is no-one working on the Hamburg Beam within the HPS community. At this moment, the construction and installation relies solely on AFP and Austin. • TOTEM brings a very competent community. No-one in CMS has their knowledge. The HPS community is too small and it will collapse without TOTEM. • LHCC supports the CMS-TOTEM combination • INFN supports monetarily CMS & TOTEM. • For this reasons we are not interested in solution 1) without TOTEMs’ support 2) that includes the Hamburg Beam pipe.

More Related