An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Trans-Caledon Tunnel Authority [TCTA]; Water Research Commission [WRC] and Inkomati Catchment Management Agency [ICMA] ANNUAL REPORTS FOR 2007/08 24 October 2008 Silas Mbedzi: Chief Director: Institutional Oversight

  2. TCTA: DWAF’s oversight role • DWAF scrutinised TCTA’s AR & assessed the enitity’s performance i.r.o. all its functions against the objectives set out in its Shareholder Compact • DWAF evaluated the FS for 2007/08 & provided TCTA with comprehensive comments & questions • TCTA responded satisfactorily to the above • The Minister noted the content of the AR & approved the tabling thereof in Parliament • TCTA’s AR was tabled on 26 Sept 2008 in ATC No 125

  3. TCTA: Salient detail from FS

  4. TCTA: Salient detail from FS [2] • Unqualified audit • Net deficit reflects a shortfall in interest cover, but debt will be repaid over planned repayment period • Projected cash flow suggests that business is viable & can continue as a going concern • TCTA projects: • LHWP – mostly operation & maintenance • Berg Water Project – recently completed • VRESAP – still under construction • Each project is ring-fenced, with no project having cross default implications to another project

  5. WRC: DWAF’s oversight role • DWAF scrutinised WRC’s AR & evaluated the FS for 2007/08 • DWAF provided WRC with comprehensive comments & questions • The Minister noted the content of the AR & approved the tabling thereof in Parliament • WRC’s AR was tabled on 30 Sept 2008 in ATC No 127 • A meeting between DWAF & WRC officials will be held on 31 Oct ’08 to discuss DWAF’s comments

  6. WRC: Salient detail from FS

  7. WRC: Salient detail from FS [2] • Unqualified audit • Income is mainly derived from water research levies (85%) • Funds successfully obtained from other local & international sources: R13,3 million • 664 students are supported by WRC projects, of whom 65% are from disadvantaged backgrounds

  8. WRC: Salient detail from FS [3] • Research project funds were distributed among Key Strategic Areas as follows: • Water Resource Management 34% • Water-linked Ecosystems 15% • Water Use & Waste Management 25% • Water Utilisation in Agriculture 26%

  9. ICMA: DWAF’s oversight role • DWAF scrutinised ICMA’s AR & assessed the enitity’s performance i.r.o. all its functions against the objectives set out in the Memorandum of Agreement • DWAF evaluated and commented on the FS for 2007/08 • The Minister noted the content of the AR & approved the tabling thereof in Parliament • ICMA’s AR will be tabled at the end of October 2008 • A meeting between DWAF and the ICMA will be arranged to discuss DWAF’s comments

  10. ICMA: Salient detail from FS

  11. ICMA: Salient detail from FS [2] • Unqualified audit • As a newly established entity the ICMA extensively expanded it’s operations • Income is still reflected as grant income as the ICMA has not been delegated the function to bill and collect water use charges • A plan of action with time frames needs to be developed on functions and personnel that still have to be transferred to the CMA

  12. THE END THANK YOU