An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contact: Beth Morris 317-638-9432 beth@westindydev.org

  2. Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes: • Continuous pedestrian and bicycle connections along Morris Street between the future Eagle Creek and White River Greenways • Improved sidewalks, street trees, medians and crosswalks at key intersections; • Curb bump-outs and planters to define parking zones and reduce crosswalk width; • Alternative stormwater management practices; GOALS

  3. Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes: • Enhanced transit stops; • Bicycle connection to the White River Greenway trailhead to be constructed in 2011 at I-70 and Kentucky Avenue; • Rerouting truck traffic and the reallocation of travel lanes to allow bicycle and pedestrian facilities within existing right-of-way; and • Purchase of right-of-way (or donation) from major institutions such as IPL to incorporate pedestrian accommodations and minimize the removal or relocation of major utility poles GOALS

  4. Morris Street Complete Street Plan • Alternate truck routes: • From the west: exit I-70 at Holt Road. Exit/use Tibbs Avenue • From the north: use Washington Street (W) or Oliver Ave (E) • From the east: use Kentucky Ave • South: use Minnesota / Kentucky Ave CONTEXT

  5. Morris Street Complete Street Plan Key Transitions: 1 – Eagle Creek Greenway Gateway: gateway node; connect bicycles and pedestrians to greenway system 2 – Tremont Street Gateway: transition from multi-use path to separated bike sharrow and sidewalk 3 – Belmont Village Mixed-Use Center Gateway: transition from 4 lanes to 2 lanes with dedicated parking 4 – Harding Street Intersection Gateway: improved pedestrian connectivity to Health Center and reasonable accommodation for WB50 trucks 5 – Kentucky Avenue Gateway: vehicular lane transitions, transition from bike sharrow to multi-use path 6 – White River Greenway Gateway: gateway node; extend bicycle and pedestrian facilities over the bridge KEY PLAN

  6. Morris Street Complete Street Plan • Neighborhood Commercial District Visualization • on-street parking • tree lawns where space allows • improved and widened sidewalks where space allows • re-routed truck traffic • street furnishings: light fixtures, banners, improved transit shelters, benches KEY PLAN

  7. Morris Street Complete Street Plan • Identity Element Concepts • identity logo • enhanced bus shelters • decorative street lights • gateway features • sitting nodes, wayfinding signage, bollards IDENTITY ELEMENT CONCEPTS

  8. Morris Street Complete Street Plan 1 - EAGLE CREEK GREENWAT GATEWAY CONCEPT

  9. Morris Street Complete Street Plan 2 – TREMONT STREET GATEWAY CONCEPT

  10. Morris Street Complete Street Plan 3 – BELMONT VILLAGE MIXED-USE CENTER CONCEPT

  11. Morris Street Complete Street Plan * see geometric plans for conventional intersection option 4 – HARDING STREET GATEWAY INTERSECTION CONCEPT: ROUNDABOUT *

  12. Morris Street Complete Street Plan 5 – KENTUCKY AVENUE GATEWAY CONCEPT

  13. Morris Street Complete Street Plan 6 – WHITE RIVER GREENWAY GATEWAY CONCEPT

  14. Preliminarily Geometric Layout Plans available THANK YOU! Contact: Beth Morris 317-638-9432 beth@westindydev.org

  15. Morris Street Complete Street Plan 1 - GEOMETRIC LAYOUT PLAN: Eagle Creek to Warman

  16. Morris Street Complete Street Plan 2 - GEOMETRIC LAYOUT PLAN: Warman to Bedford Street

  17. Morris Street Complete Street Plan 3 - GEOMETRIC LAYOUT PLAN: Bedford to Tremont Street

  18. Morris Street Complete Street Plan 4 - GEOMETRIC LAYOUT PLAN: Tremont Street to Sheffield Ave

  19. Morris Street Complete Street Plan 5 - GEOMETRIC LAYOUT PLAN: Belmont Intersection

  20. Morris Street Complete Street Plan 6 - GEOMETRIC LAYOUT PLAN: Kappes to Shepard St

  21. Morris Street Complete Street Plan 7 - GEOMETRIC LAYOUT PLAN: Shepard to Reisner Street

  22. Morris Street Complete Street Plan 8a - GEOMETRIC LAYOUT PLAN: Harding Street Roundabout Option

  23. Morris Street Complete Street Plan 8b- GEOMETRIC LAYOUT PLAN: Reisner to Harding Street: Conventional Intersection

  24. Morris Street Complete Street Plan 9 - GEOMETRIC LAYOUT PLAN: Harding to Railroad Overpass Conventional Intersection

  25. Morris Street Complete Street Plan 10 - GEOMETRIC LAYOUT PLAN: Division Street Intersection

  26. Morris Street Complete Street Plan 11 - GEOMETRIC LAYOUT PLAN: Division to Kentucky Ave

  27. Morris Street Complete Street Plan 12 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Intersection

  28. Morris Street Complete Street Plan 13 - GEOMETRIC LAYOUT PLAN: White River Parkway W Intersection

  29. Morris Street Complete Street Plan 14 - GEOMETRIC LAYOUT PLAN: White River Parkway E Intersection

  30. Morris Street Complete Street Plan 15 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Bike Lanes to Greenway Trailhead