An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMMA Extraction Bruno Muratori

  2. Extraction (07/03/11) • Going clockwise towards extraction • Yellow = Inj. Kicker1 • Pink = Ext. Kicker1 • Green = Ext. Kicker2 • Magenta = beam • Action of injection kicker too early to be seen • Magenta spikes = turns • Effect of extraction clearly visible • Image seen on first YAG screen in extraction / diagnostic line  • Extract at every turn !

  3. Problems … • Cannot reach YAG-02 or any after it … • Cannot even reach second BPM … • Septum aperture clearly seen

  4. Details • We see beam on BPM-01 • Beam centred (+/-) on YAG-01 • Tried many (though not all …) combinations of quads on & off BPM-02 YAG-01 & SLIT-01 BPM-01 Possible trajectory YAG-02 EMMA 3 correctors located here – two vertical & one horizontal

  5. Possible solutions • BPM-02 not working correctly • BPM-01 & 02 changed at source for next run • SLIT-01 somehow in the way • Slit moving when light on YAG-01 & it is out so this should not be the problem - checked • All YAGs have metallised coating on one side • Could it be the wrong way around ? To be checked • Obstruction in the beam pipe ? • Only extraction line, could open up - to be checked • Quad scan on YAG-01 & re-match from there ? • Quadrupole misalignment ? Other ?

  6. Extraction set-up (1) • K1 & K2 occur at time t1 • Revolution time ~ 55 ns • Orbits → outside as energy increases • Set 18.5 MeV/c equivalent first (higher ?) • Make sure 18.5 MeV/c set-up optimised • Set extraction kickers (K3 & K4) and septum to: • Time t1 + ~ 25 × 55 / 42 ns + N × 55 ns • Pick good setting with many turns (~ 50 or more) • Try several other values of N • Set extraction line at 12 MeV/c

  7. Extraction set-up (2) • Look on YAG23 to make sure beam towards outside as expected • Change septum & kicker strengths until something is seen on YAG-01 in extraction • Make sure beam as centred as possible down extraction line • Look at YAG-02 in extraction • Do not accelerate at first • Repeat for many equivalent energies (10 – 20 MeV) & extract to 12 MeV extraction line • Save settings throughout & compare to model

  8. Extraction set-up (3) • Last BPM in injection line currently used as trigger so, from LeCroy scope, re-cable and: • Set timing of K1 with this BPM as trigger then • Use K1 as trigger for extraction • Set the timing of the extraction septum by: • Ch 1: Injection septum, Ch 2: Extraction septum • Then: • Ch 1: K3, Ch 2: K4, Ch 3: BPM E23, Ch 4: K2, Aux : K1 • I have been told there are five (already labelled) cables available: 3 for extraction magnets & 2 spares

  9. Extraction set-up (4) • Extraction with acceleration: • Set 12 MeV/c in extraction line as before • Set cavities to right crest & zero volts • Put bunch in bucket • Extract beam as before (1/2 turn & multi-turn) • Look at YAG-01 in extraction line • Slowly increase cavity volts until bunch leaves YAG-01 • Set 18.5 MeV/c in extraction line • Estimate number of turns required to achieve this • Inject real 12.5 MeV/c beam • Extract with YAG-01 & then YAG-02