110 likes | 461 Views
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks -- 20-22 Feb 2013 Paris, France. Air traffic management operations are becoming more dependent on communication and surveillance capabilities and performances. NAT Region. NAM Region. EUR Region. RLongSM.
E N D
ICAO Performance Based Communication and Surveillance Workshop-- Closing Remarks --20-22 Feb 2013Paris, France
Air traffic management operations are becoming more dependent on communication and surveillance capabilities and performances NATRegion NAMRegion EURRegion RLongSM RLatSM DLM Link 2K+ DCL Capacity
Safety promotion NAT PBCS Workshop Task 4 of NAT PBCS Implementation Plan Training and education - Safety communication Exchange information and promote global harmonization
Overview – Session 1 Global and regional ICAO and industry standards, recommended practices and guidance material Annexes 6 & 11, Doc 4444 (PANS/ATM), Doc 9869, GOLD RTCA / EUROCAE Interoperability (INTEROP) and Safety and Performance (SPR) standards Existing FANS 1/A and ATN B1 and future B2
Overview – Session 2 Capacity and efficiency - Use of data link / mandates(NAT and EUR) Reduced separations predicated on communication and surveillance performance 5-minute, 30 NM and 50 NM longitudinal separation 25 NM and 30 NM lateral separation ITP and CDP DARP and UPR Transition to performance based navigation, communication and surveillance
Overview – Session 3 Approval requirements for ANSP and operator / aircraft equipment and capability Perspectives - ANSP (FAA), CSP (ARINC), SSP (Inmarsat), A/C mfgr (Airbus / Boeing), operator (Delta / IFALPA) Post-implementation monitoring (FAA / Airways New Zealand) Data link regional monitoring agencies (DLMA and CRO)
Discussion topics Amendments needed to ICAO Annexes, PANS, recommended practices and guidance material Application and flight plan requirements (Doc 4444) ATS provision (Annex 11) Operational approvals (Annex 6) Guidance material – Doc 9869 Post implementation monitoring Feedback to operators and other interested parties on performance issues Global coordination and consistent approach Adoption of RCP in the EUR Region Orderly transition to implement
Feedback Any follow-up? Was the workshop useful? Should there be another workshop and when?