An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KYLE CROSSING ROAD RECONSTRUCTIONPREBID MEETING MARCH 28, 2019, 2:00 PM CITY OF KYLE PUBLIC WORKS DEPARTMENT

  2. Project Team and Introductions • Owner: City of Kyle • Engineer: JoAnn Garcia, PE • Engineer: Keshav Gnawali, PE • City Inspector: Ricardo Cisneros • Stormwater Management Plan Admin: Kathy Roecker

  3. Location VISTA RIDGE DRY HOLE ROAD END PROJECT STA. 35+81.32 MATCH EXISTING ELEVATION KYLE CROSSING I - 35 BEGIN PROJECT STA. 1+29.32 MATCH EXISTING ELEVATION KOHLER’S CROSSING

  4. Project Description • Location & Limits: Kyle Crossing between Kohler’s Crossing and Vista Ridge • Nature of Project: Road Reconstruction • Length: The project is approximately 3,500 linear feet • Soften the curve close to Dry hole Road • Three lane 36 feet wide road way and 3 feet shoulder on both side • Replace Metal Beam Guard Fence • Geogrid applied to entire length • Bid Opening Date: April 10, 2018, 2 Pm at City of Kyle Public Works Departments • Maintain North bound traffic • South bound will not be available • Two way traffic up to Dry Hole Road

  5. Typical Sections

  6. Easement and Utility Status • Utility Status: Overhead and underground utilities exist near the project. The locations of underground utilities shown in plans are approximate. Contractor is responsible to make calls to providers and City of Kyle Public Works to coordinate with providers before commencing any work that might affect present utilities. • City of Kyle is not a member of 1 800 DIGTESS

  7. Subsidiary Items The following are subsidiary items of this contract • Dust Control • Proof Roll • Cold Mix Application • Providing a traversable safe passage for traffic • Temporary Pavement Striping