An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NS Rickenbacker Chris Luebbers Norfolk Southern – The Thoroughbred of Transportation

  2. The Heartland Corridor Norfolk Southern – The Thoroughbred of Transportation

  3. Norfolk - Midwest

  4. The Heartland Corridor The Heartland Corridor Projects: Mainline Clearance Project: $150mm Heartland Route requiring no improvements Roanoke, Terminal $22mm Prichard, WV Terminal $19mm Central Corridor Total $191mm Government Funding Federal $95mm Ohio $1mm Virginia $22mm West Virginia $15mm Total Government $133mm Columbus Rickenbacker, Terminal

  5. Heartland Corridor: Central Corridor Double-Stack Project Scope • 28 Tunnels • 30,000+ feet to be Cleared • Virginia, West Virginia and Kentucky • 24 Overhead Obstructions • Bracing Modifications, Fencing Modifications, Overhead Wire Removal, Miscellaneous Signal Work • West Virginia and Ohio

  6. Central Corridor Double-Stack Project: The current clearance envelope through West Virginia only accommodates railcars up to 19’1” multi-levels. No double-stack cars can be accommodated in West Virginia due to the height, as well as the square profile of the conveyance.

  7. Rickenbacker Intermodal Norfolk Southern – The Thoroughbred of Transportation

  8. Columbus Rickenbacker Intermodal Terminal • 225 Acres • 12,000’ Support Track • 1,800 Wheeled Parking Spots • 450 Stacked Spaces (2 high) • Annual Lift Capacity 250,000 • Ground Broken September 2006 • First Train: March 3, 2008 • Estimated Cost: $61 Million

  9. Rickenbacker Benefits • Support and Pad Tracks • Improved Terminal Design • Expanded Parking • Automatic Gate System (AGS) • Proximity to Rickenbacker Complex