1 / 11

UM – System A.I.T.S.

UM – System A.I.T.S. PeopleSoft Implementation Plan By Ben Phelps. Transition Factors. Relational (SA, FS, HR, EPM) Integrated (UM, MU, UM-R, UMKC, UMSL, HOSP, etc.) Row Level Security (bittersweet) Effective Dating

Download Presentation

UM – System A.I.T.S.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UM – System A.I.T.S. PeopleSoft Implementation Plan By Ben Phelps

  2. Transition Factors • Relational (SA, FS, HR, EPM) • Integrated (UM, MU, UM-R, UMKC, UMSL, HOSP, etc.) • Row Level Security (bittersweet) • Effective Dating • Multiple Relationships within System • Data stored in single location

  3. Architecture SA FS HR EPM

  4. Architecture SA FS HR EPM

  5. HR PRD 76* (Dynamic) HR RPT 76* (Static) HR TRN 76* HR DEV 76 HR TST 76 HR CNV 76 HR QA 76 HR CNV 83 HR TST 83 Plus ODBC * User interface Database Instances

  6. Enterprise Performance Management HR RPT FS RPT SA RPT

  7. Enterprise Performance Management HR RPT HR ODS FS RPT FS ODS SA RPT SA ODS

  8. Enterprise Performance Management HR RPT HR ODS Warehouse (engine) FS RPT FS ODS SA RPT SA ODS

  9. EPM (continued) • Cubes (multi-dimensional reporting) • Balanced Scorecards (ties reporting to strategic plan) • Analytics (forecasting & scenarios)

  10. Implementation Schedule

  11. UM – System A.I.T.S. Questions?

More Related