110 likes | 166 Views
This implementation plan by Ben Phelps outlines key factors like Row Level Security, Effective Dating, and Managing Multiple Relationships within the System. The architecture includes SA, FS, HR, and EPM components with data stored in a single location. The plan covers various phases such as HR.PRD.76 (Dynamic) and HR.CNV.83, along with user interface and database instances. It also focuses on Enterprise Performance Management and utilizing Cubes, Balanced Scorecards, and Analytics for reporting and strategic planning. The schedule and structure aim to ensure a smooth transition to the PeopleSoft system.
E N D
UM – System A.I.T.S. PeopleSoft Implementation Plan By Ben Phelps
Transition Factors • Relational (SA, FS, HR, EPM) • Integrated (UM, MU, UM-R, UMKC, UMSL, HOSP, etc.) • Row Level Security (bittersweet) • Effective Dating • Multiple Relationships within System • Data stored in single location
Architecture SA FS HR EPM
Architecture SA FS HR EPM
HR PRD 76* (Dynamic) HR RPT 76* (Static) HR TRN 76* HR DEV 76 HR TST 76 HR CNV 76 HR QA 76 HR CNV 83 HR TST 83 Plus ODBC * User interface Database Instances
Enterprise Performance Management HR RPT FS RPT SA RPT
Enterprise Performance Management HR RPT HR ODS FS RPT FS ODS SA RPT SA ODS
Enterprise Performance Management HR RPT HR ODS Warehouse (engine) FS RPT FS ODS SA RPT SA ODS
EPM (continued) • Cubes (multi-dimensional reporting) • Balanced Scorecards (ties reporting to strategic plan) • Analytics (forecasting & scenarios)
UM – System A.I.T.S. Questions?