July 16, 2008. Bunge-Ergon Vicksburg , LLC Construction Facts. Plant Construction Began on February 9, 2007 Construction Labor Peaked at 375 Employees 9,000 Yards of Concrete 1,000 Tons of Structural Steel 500,000 Feet of Wire (App. 100 Miles) 60,000 Feet of Pipe (App. 11 Miles)

Download Presentation

July 16, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. July 16, 2008

  2. Bunge-Ergon Vicksburg, LLC Construction Facts • Plant Construction Began on February 9, 2007 • Construction Labor Peaked at 375 Employees • 9,000 Yards of Concrete • 1,000 Tons of Structural Steel • 500,000 Feet of Wire (App. 100 Miles) • 60,000 Feet of Pipe (App. 11 Miles) • Plant Startup June 1, 2008 • $100 MM+ Total Construction Cost

  3. Bunge-Ergon Vicksburg, LLC Local Impact • SpecFab • Fabricated All Pressure Vessels and Columns in the Plant • Fabricated Approximately 60% of all of the Plant’s Piping • Ergon Maintenance Services (EMS) • Performed Miscellaneous Structural Steel Fabrication • Structural Steel Erection, Main Utility Tie-Ins, Pile Driving, and Various other Construction Activities • Miscellaneous Vicksburg Vendors • RSC, American Supply Company, Nordan Smith, Stuart C. Irby, Bell’s Ice, Unitech, McCoy’s, Vicksburg Sand and Gravel, Ram Electric, Clark Machine, Delta Stone, Rebel Welding, CTSI Surveying, Falco, MMC, and Many Others. • Approximately 40 Construction Employees were from Vicksburg, and Many Others Commuted

  4. Bunge-Ergon Vicksburg - February 14, 2007

  5. Bunge-Ergon Vicksburg - February 26, 2007

  6. Bunge-Ergon Vicksburg – March 28, 2007

  7. Bunge-Ergon Vicksburg – May 10, 2007

  8. Bunge-Ergon Vicksburg – June 8, 2007

  9. Bunge-Ergon Vicksburg – July 18, 2007

  10. Bunge-Ergon Vicksburg – August 29, 2007

  11. Bunge-Ergon Vicksburg – October 15, 2007

  12. Bunge-Ergon Vicksburg – December 15, 2007

  13. Bunge-Ergon Vicksburg – April 9, 2008

  14. Bunge-Ergon Vicksburg – June 10, 2008

  15. Bunge-Ergon Vicksburg, LLC 22 Million Bushels per year of corn 180,000 Tons of Dried Distiller’s Grain 60 Million Gallons per year of Fuel Grade Ethanol

  16. How is Ethanol Produced? • Drymill Ethanol Plant • Mash Preparation • Fermentation • Distillation • Product Drying • Water Recovery

  17. How is Ethanol Produced ? -Corn Grinding -Water and Enzymes Addition -Liquifaction

  18. How is Ethanol Produced ?

  19. How is Ethanol Produced ?

  20. Bunge-Ergon Vicksburg, LLC 22 Million Bushels per year of corn 180,000 Tons of Dried Distillers Grains 60 Million Gallons per year of Fuel Grade Ethanol

  21. Corn Origination

  22. Bunge-Ergon Vicksburg, LLC 22 Million Bushels per year of corn 180,000 Tons of Dried Distillers Grains 60 Million Gallons per year of Fuel Grade Ethanol

  23. Distiller’s Dried Grains

  24. Bunge-Ergon Vicksburg, LLC 22 Million Bushels per year of corn 180,000 Tons of Dried Distillers Grains 60 Million Gallons per year of Fuel Grade Ethanol

  25. Ethanol Marketing

  26. Ethanol in Mississippi

  27. Model View of the BEV Plant

  28. Actual View of the BEV Plant