Lessons learned & PoAs as a chance for CDM host countries

This programme of activities highlights challenges, advantages, and achievements of PoAs in CDM host countries. It provides insights and perspectives on implementation, transaction costs, stakeholder interactions, and more.

varen
Download Presentation

Lessons learned & PoAs as a chance for CDM host countries

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Programme of ActivitiesLessons learnt &PoAs as a chance for CDM Host Countries • UNFCCC Joint Coordination Workshop • 12-13 March 2011, Bonn • Perspectives GmbH, Hamburg • Marc André Marr

  2. PoA specific challenges Implementation of PoAs • Suitability of CE and interdependencies DNA related challenges • Very limited or no experience with PoAs Methodology related challenges • PoA specific requirements and limited suitability (e.g. combination) Reducing transaction costs? • PoA initially involves higher CDM transaction costs DOE liability • Result: Contrary to initial idea of the PoA concept “Reduce transaction costs” Stakeholder interaction and interrelations

  3. PoA Case Study Mini hydro-power Africa PoA idea • Two PoAs for newly built mini-hydro power plants for rural electrification (replacing diesel generation) Current status • Support for Coordinating Entity • Business model finalized • Project developers identified • PoA Idea Notes finished • Incentive scheme developed • Terms of references • Support in promotion material

  4. PoA Case Study Mini hydro-power Africa Business Model of the PoA • Rural Electrification Agency will be Coordinating Entity • Supports CPA developers • Administers the PoA • Responsible for monitoring • CPA developers • Construct and operate the projects • Conduct on-site monitoring (metering) • Financial institutions • Providing soft loans

  5. PoA Case Study Mini hydro-power Africa Key advantages of the PoAs • Enable projects that would otherwise never be realized • No access to finance • Insufficient capabilities & capacities • Support rural electrification in a sustainable way • Lowering the risks for investors and carbon buyers due to established framework

  6. PoA Case Study Mini hydro-power Africa Main challenges of the PoAs • Institutional framework with interrelations and dependencies • Setting up a business model which enables a high participation and being operable • High level of standardization required

  7. What PoAs can achieve • PoAs enable project activities that otherwise would not be realized • PoAs can significantly • Reduce transaction costs • Save time from initial idea to CER issuance • Lower the risks for investors and CER buyers • PoAs are able to set the basis for NAMA development • PoAs can be an attractive additional CDM option

  8. What is required for enable a greater use of PoAs? • Increased stakeholder interaction => PoA Working Group • Solution oriented approach • Identify and develop methodological simplifications • Standardization; default factors • Combination of methodologies (pick and choose) • PoA specific methodologies • Clear guidance on Liability (currently playground for DOEs) • Opportunities for up-front financing • Support from UNFCCC (e.g. clear statement, guidelines, case studies)

  9. Thank you! Perspectives GmbH Marc André Marr Head of Carbon Project Services marr@perspectives.cc